Laserfiche WebLink
- - � O 5 10 20 STOCKTON CA ADDITIVE TANK ADDITION STANDARD EROSION CONTROL NOTES <br /> 1, WHEN RAINFALL AND RUNOFF OCCURS DAILY INSPECTIONS OF THE;. EROSION AND SEDIMENT <br /> DEMOLITION AND EROSION CONTROL PLANCONTROLS <br /> R ENC DDISCHARGE <br /> PRINCIPLES,MUST <br /> BE PROVIDED I BY SOME ONE KNOWLEDGEABLE <br /> 1 10' AND INSTALLATION, AND MAINTENANCE OF <br /> EROSION AND <br /> I .SEDIMENT CONTROLS WHO WORKS FOR THE PERMITTEE. <br /> co <br /> i 2. CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVATION AND CREATION OF BARE <br /> LEGEND <br /> EXGROUND FROM OCTOBER 1 THROUGH MAY 51 EACH YEAR. <br /> . CURES <br /> m EXISTING BARRIER CURB <br /> m TO BE DEMOLISHED q3 DURING WET WEATHER PERIOD, TEMPORARY STABILIZATION OF THE SITE MUST OCCUR AT 'THE <br /> I j CURB END OF EACH WORK DAY.. <br /> EX 1 <br /> =� <br /> PAVEMENT TO BE <br /> ASPHALT/CONCRETE � � � <br /> 00 <br /> EXISTING ASPFiALw L�EMC)L,I,F�E[� <br /> 4, SEDIMENT CONTROLS MUS"f BE INSTALLED AND MAINTAINED ON ALL DOWN GRADIENT SIDES OF <br /> ESTABLISHED.T THE CONSTRUCTION SITE AT ALL.. TIME, DURING CONSTRUCTION, THEY MUST REMAIN IN PLACE <br /> -.___ .__ UNTIL PERMANENT VEGETATION OR OTHER PERMANENT COVERING OF EXPOSED SOIL IS <br /> q f F <br /> TLS 350R PANEL EX. CURD !, __ . _.__ CLEARING LIMITS <br /> 5 <br /> EXISTING VEEDER ROOT <br /> EX, CONTROLLER EX, LS q CONSTRUCTION FENCE -- - icy <br /> ENCLOSURE IRR q 5, ALL. ACTIVE INLETS MUST HAVE SEDIMENT CONTROLS INSTALLED AND MAINTAINED AT ALL TIMES <br /> � f <br /> ! / PERIMETER PROTECTION � ,, ,� DURING CONSTRUCTION, UNLESS OTHERWISE APPROVED, A SURFACE MOUNTED AND <br /> _ . ATTACHABLE, U-SHAPED FILTER BAG IS REQUIRED FOR ALL CURB INLET CATCH BASINS, <br /> CLEARING LIMITS ONLY q <br /> { <br /> q �`` ° EXISTING DRAINAGE FL�OWPATH G. SIGNIFICANT AMOUNTS OF SEDIMENT WHICH LEAVES THE SITE MUST BE CLEANED UP WITHIN " <br /> q EX, CONCRETE <br /> TRENCHROUTE <br /> a � _ AND STABILIZED OR PROPERLY DISPC)SED, THE <br /> 24 HOURS AND PLACED BACK ON THE SITE <br /> II ! /% PAVEMENT _.... ._. __.. _..._. _ STORM DRAIN INLET PROTECTION , CAUSE OF THE SEDIMENT RELEASE MUST BE FOUND AND PREVENTED FROM CAUSING A . -- <br /> C <br /> , . x RE URRE NC.._F <br /> OF THE DISCHARGE WITHIN THE SAME 24 HOURS. � <br /> m qCL 0 <br /> m 7, SEDIMENT MUST NOT BE INTENTIONALLY WASHED INTO STORM SEWERS, DRAINAGE WAYS, OR <br /> C WATER BODIES. <br /> �> <br /> _.._.. . ... _ ._... .._. :_... I m <br /> .�... ._ .�,... -...-�. � _.____.__._ � �,F`�`' B, SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL. MEASURES WHEN 11° HAS <br /> I � � ._.`` REACHED A HEIGHT OF 1/3RD THE BARRIER HEIGHT, AND PRIOR TO THE CONTROL MEASURES " <br /> _..�. _. _ __.._.w_ �__.._ _ ;:__h,______.� _ m.. ____._ .__,.�_.._ L.. 1. ATTEND PRECONSTRUCTION MEETING WITH CITY OF STOCKTON. -- <br /> - { _ REMOVAL, <br /> -^" I R 2. FLAG CLEARING LIMITS. -15 <br /> f' m D, CLEANING OF ALL STRUCTURES WITH SUMPS MUST OCCUR WHEN THE SEDIMENT RETENTION <br /> I q EX. <br /> E..3.O <br /> m e�' - m..( CAPACITY HAS BEEN REDUCED BY 5O AND AT COMPLETION OF PROJECT, <br /> II { wF� 1 INSTALL PERIMETER PROTECTION BMPS AS SHOWN ON PLANS. - -- <br /> SWITCH � �� I a � I, .,, ,� ,__..._____. _.. __ , <br /> r I <br /> �. 6 <br /> ' q �' _ S w. HAZARDOUS MATERIALS MUST INCLUDE PROPER STORAGE, <br /> �. INSTALL .NORM DRAIN INLET PROTECTION A,� ;MOWN ON PLANS. 1O, ANY USE OF TOXIC OR OTHER <br /> APPLICATION, AND DISPOSAL, <br /> EXr <br /> SLAUlCA OPY ` - 5. CLEAR AND GRUB SITE, COMPLETE DEMOLITION ANL, PERFORM ROUGH GRADING, <br /> I ` _ 11, THE PERMITTEE MUST PROPERLY MANAGE HAZARDOUS WASTES, USED OILS, CONTAMINATED <br /> l E CONSTRUCT SITE IMPROVEMENTS, SOILS CONCRETE WASTE SANITARY WANE LIQUID WASTE OR OTHER TOXIC SUBSTANCES <br /> _ DISCOVERED OR GENERATED DURING CON STRIJCTION. <br /> U'd <br /> q i f 9 EP�X E'' O q 7. REMOVE PERIMETER PROTECTION BMPS AND STORM DRAIN INLET PROTECTION, <br /> m - WITCH <br /> � El <br /> CALL FOR CITY OF S'TOCKTON FOR FINAL INSPECTION, - B m � - �-� <br /> 12. CI-tE APPLICATION RATE OF ANY FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW <br /> q MANUFACTURERS RECOMMENDATIONS, NUTRIENT RELEASES FROM FERTILIZERS TO SURFACE <br /> EXLS AREA <br /> , r, r <br /> _._. :_ ___..,___ . _,_._: T::_: I WATERS MUST BE MINIMIZED, TIME RELEASE FERTILIZERS SHOULD BE USED AND CARE <br /> _._...,. <br /> _..._. ._ _.._. TAKEN IN APPLICATION OF FERTILIZERS WITHIN ANY WATER WAY RIPARIAN ZONE, <br /> I 1 � <br /> 13, OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND <br /> q <br /> MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, IN ACCORDANCE WITH <br /> a S � cr <br /> DEMOLITION � CURRENT CLEAN WATER SERVICE. .STANDARDS AND STATE, AND FEDERAL REGULATIONS, <br /> i <br /> 14, PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING LIMITS, <br /> m ' <br /> I + ,, L _.. __. OFFSITE1 EXISTING CONCRETE CURB TO BE DEMOLISHED AND DISPOSED OF OF 'SIONLY SHOWN ON THIS PLAN SHALL BE: CLEARLY DELINEATED IN THE FILLD, UNLESS OTHERWISE <br /> T <br /> AS NECESSARY FOR PROPOSED CONSTRUCTION, APPROVED, NO DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS. <br /> 9 j - f 2 EXISTING ASPHALT/CONCRETE PAVEMENT TO BE DEMOLISHED AND DISPOSED OF <br /> STOR __DRAIN_____. r r, f i ..._.._.c ..._..._.., __ OFFSITE, 15. PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BMPS THAT MUST BE INSTALLED ARE <br /> m 'I INLET PROTECTION m PERIMETER SEDIMENT CONTROL, AND INLET PROTECTION. THESE BMPS MUST BE MAINTAINED <br /> EX, CONCRETE (D- T 5 DEMOLISH EXISTING LANDSCAPE AND IRRIGATION ONLY AS NECESSARY FOR FOR THE DURATION OF THE PROJECT, <br /> EX, STORM-� ,�' EX. CURB 1 PROPOSED CONSTRUCTION. CONTRACTOR TO RESTORE/MAINTAIN IRRIGATION SYSTEM <br /> TO NEW LANDSCAPE AREA. <br /> a 16, IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAN <br /> ` DRAIN 4 SAWC,LJT / j E.X. PARKING,- AN <br /> m <br /> EX, CONCRETE f, m SAWCUT LINE, CONTRACTOR TO PROVIDE A SMOOTH, CLEAN EDGE FOR SEPTEMBER 1ST, THE TYPE AND PERCENTAGES OF SEED IN THE MIX ARE AS IDENTIFIED ON <br /> m PAVEMENT Y f,.. ° - -. - _.__ _-_ _.. 4 MATCHING INTO EXISTING PAVEMENT. THE PLANS OR AS SPECIFIED BY THE DESIGN ENGINEER, <br /> CONSTRUCT( N FENT SHORING A NECESSARY, CONTRACT' <br /> _.,, _-,.. m _.- _ n _ P _ CE 5 �" LL SUPPLY SHORING DESIGN AND 17, WATER-TIGHT TRUCK: MUST BE USED TO TRANSPORT SATURATED SOILS FROM THE <br /> OR SHA <br /> m I ;, �~ OBTAIN NECESSARY PERMITS IF REQUIRED. CONSTRUCTION SITE. AN APPROVED EQUIVALENT IS TO DRAIN THE SOIL ON SITE AT A <br /> q „„ ._ _. _ _ _ - SOIL MUST BE DRAINED SUFFICIENTLYFOR <br /> q <br /> a, f _ .� _ _ _ DESIGNATED LOCATION USING APPROPRIATEBMPSa � _ <br /> MINIMAL SPILLAGE, <br /> � I / <br /> " .a <br /> � t ALL PUMPING OF SEDIMENT LADEN WATER MUST BE DISCHARGED OVER AN UNDISTURBED,,PERIMETER PROTECTION 1 � <br /> PREFERABLY VEGETATED AREA, AND THROUGH A SEDIMENT CONTROL BMP (I.E. FILTER BAG). <br /> SHORING 5 PERIMETER PROTECTION � � FESSf <br /> - 3 EX. I..S ( 1 _ 19, THE ESC PI.AN MUST BE KEPT ONSITE, ALL MEASURES SHOWN ON THE PLAN MUST BE R�yO ��� <br /> EX, ASPHALT 2 q CONTRACTOR TO INSTALL. F ERIMETER PROTECTION SILT FENCE, SAND INSTALLED PROPERLY TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER A SURFACE <br /> q ���� ; ,� R IRR ( ( F; <br /> m <br /> BAGS, FILTER BERMS) PER CITY OF STOCKTON STANDARDS AT ALL WATER SYSTEM, ROAD"NAY, OR OTHER PROPERTIES. ; = <br /> ' L ��`��', 1 r' LADEN RUNOFF FROM LEAVING ;, IAL P. GRUB, , <br /> �> <br /> CONSTRUCTION FENCE- - -.._._.__.._ PERIMETER LOCATIONS TO PREVENT SILT <br /> -LADEN <br /> t EX. CURB THE CONSTRUCTION AREA AND AS DIRECTED BY THE CITY INSPECTOR. <br /> m ?C1. THE ESC MEASURES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR <br /> ' \� MEASURES HALL <br /> ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE M_ S `.a � _ 'I I <br /> q .. _...._. ._ -' <br /> ,,,���` ,� t ,, I_.._�__ _:-��- __�-- -�- __�,,, BE UPGRADED AS NEEDED TO MAINTAIN COMPLIANCE WITH ALL REGULATIONS, <br /> d <br /> q EX. ASPHALT STORM DRAIN INLET PROTECTION <br /> PAVEMENT ~ CONTRACTOR 6/50/1 <br /> / __._...._.___ � TO INSTALL_ CATCH BASIN FILTER BAG PER DETAIL THIS ._ 21, WRITTEN ESC LOGS ARE SUGGESTED TO BE MAINTAINED ONSITE AND AVAILABLE 'TO DISTRICT a°; . <br /> ., -------- <br /> SHEET, AT OWNSTREAM INLET LOCATIONS OR AS REQUIRED TO PREVENT _ I V l \ T, <br /> INSPECTORS UPON REQUEST. , TC) , T <br /> CLEARING LIMITS ONLY �� SILT-LADEN WATER FROM ENTERING STORM DRAINAGE SYSTEM AND/OR �F CAW_\,.. ��. <br /> AS DIRECTED BY CITY INSPECTOR. 22 i ;> <br /> �, ,\ I q AS NEEDED FOR NEW N AREAS SUBJECT 'TO WIND EROSION, APPROPRIATE BMPS MUST BE USED WHICH MAY <br /> A ! IMPRC?VEMENTS CONSTRUCTION a a <br /> STAGING AREA .,. .. R INCLUDE THE APPLICATION OF FINE WATER SPRAYING, PLASTIC SHEETING, MULCHING, OR .. S <br /> CONSTRUCTION STAGING AREA (APPROXIMATE LOCATION, CONTRALTO 'TO OTHER APPROVED MEASURES. , m �_ <br /> m ` ADJUST(AS NECESSARY DURING CONSTRUCTION). <br /> f x P U) f <br /> _ C N�, , <br /> ACTOR TO UTILIZE THIS AREA FOR: 2 . ALL EXPOSED SOILS MUST BE COVERED DURING WET WEATHER PERIOD, 0 <br /> CONTRACTOR > �- <br /> MATERIAL DELIVERY AND STORAGE <br /> I <br /> i ° ;X� CONCRETE WASTE MANAGEMENT PLACE ON VISQUEEN AND COVER <br /> STOCKPILES <br /> > <br /> 011 <br /> 1. REMOVE EXISTING LANDSCAPING AND REROUTE EXISTING IRRIGATION <br /> SYSTEM AROUND CONTROLLER PAD IMPROVEMENTS AS NECESSARY TO 2 STORM DRAIN � °' <br /> u <br /> MAINTAIN IRRIGATION TO THE SITE, GRATE INLET PROTECTION <br /> M <br /> DANDY <br /> 11 <br /> 2, ONE OR MORE PORTABLE FIRE EXTINGUISHERS HAVING A RATING, OF NOT T_ <br /> LESS THAN 40BC SHALL BE LOCATED NEITHER LESS THAN 10 FEET NOR �` '' --L.IFT STRAPS <br /> MORE THAN 50 FEET FROM THE TANK STORAGE AREA, <br /> 3, CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE <br /> - <br /> SYSTEM MEETS TILE DESIGN INTENT, THE CONTRACTOR IS PERMITTED TO <br /> I <br /> ADJUST SIZES AND CUTS BASED ON ACTUAL_ FIELD CONDITIONS AND X CO <br /> INSTALLATION TEGFiNLQUES. r ° ° <br /> ,� � D: NDY LAG III W .] <br /> EROSION CONTROL NOTES: <br /> __... 00 <br /> STANDARD FABRIC IS c� N rl- <br /> _ BE AVAILABLE ON SITE f� <br /> AN ORANGE_ WOVEN � �� <br /> Q) <br /> MONOFILAI„1E:I`\IT I I ' 7 <br /> 1. ALL NECESSARY EQUIPMENT AND MATERIALS Sk-IALI. <br /> TO FACILITATE RAPID INSTALLATION OR EROSION AND SEDIMENT CONTROL ��� L <br /> BMPS WHEN RAIN IS EMINENT, ° <br /> I� _._ ... - DL_1M1=SING S1 TRAP e LjLn Ln C) <br /> Lba� AI_l_0'JVS FOR EASY , ` a <br /> 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES � REMOVAL_ OF CONTENTS DANDY BAG��11 00 Ld <br /> TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER <br /> EACH RUN-OFF PRODUCING RAINFALL, �� � INSTALLATION AND MAIN-FENANCE GUIDELINES: <br /> r� <br /> 1 THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL ” INSTALLATION: REMOVE THE GRATE 1=ROP,T CATCH BASIN, IF USING Gf>IIC NA i._ 011_ ,V <br /> MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING ABSORBENTS; PLACE ABSORBENT PILLOW IN UNIT. STAND THE GRATE ON END, <br /> INSPECTOR DUE 'TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN <br /> CIRCUMSTANCES WHICH MAY ARISE. DANDY T1�10 TDF' LIFTING STRAP; OUT OF THE WAY AND PLACE THE ..URATE INTO TNC <br /> MOVE � - a � <br /> Y BAG II `SO 'THAT THE GRATE IS BELOW THE TOP STRAPS AND ABOVE THE <br /> 4, ADEQUATE' EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION LOWER STRAP'S. HOLDING THE LIFTING DEVICES, INSERT THE GRATE INTO THE INLET. <br /> BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND <br /> I , c <br /> MAINTAINED. MAINTENANCE: REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS (31 <br /> FROM VICINITY OF ��" <br /> - � _ <br /> UNIT AFTER EACH STORM EVENT, AFTER EACH STORM EVENT AND AT REGULAR <br /> _ n �. _ <br /> �� INTERVALS LOOK INTO TI-�C DANDY BAC, 0 II. IF �TI�1C CONTAINMENT ARE:, IS MORE <br /> DEMOLITION NOTES: THAN 1/3 FULL OF SEDIMENT, THE UNIT MUST BE EMPTIED. "TO EMP-'TY UNIT, LIFT <br /> - --�' — - c � THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL " �°� <u <br /> 1, ITEMS FOR DEMOLIFION ARE DEPICTED PER DESIGN DRAWINGS, CONTRACTOR THE UNIT (�1.1T OF THE INLET USING THE LIFTING STRAPS AND REMOTE THE GRATE. <br /> 'TO LOCATE AND VERIFIY ITEMS FOR DEMOLITION PRIOR TO START OF IF' USING OPTIONAL OIL ABSORBENTS; REPLACE ABSORBENT WHEN NEAR SATURATION. EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS NOT BY POTHOLING THE UTILITIES AND <br /> SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION, THIS SHALL INCLUDE <br /> CONSTRUCTION. NOTIFY BARGHAUSEN CONSULTING ENGINEERS, INC. qq <br /> IMMEDIATELY OF ANY DISCREPANCIES OR INCOME ATABLILTIES WITH THE BASINCATCH I CALLING UTILITY LOCATE C 1-800,-227-2600 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT C 7 <br /> ' what's LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST, 'a> <br /> DESIGN, Q LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC <br /> NOT TO SCALE E "� <br /> before dig. INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL 0 <br /> 2, CONTRACTOR TO REVIEW AS--BUILT DRAWINGS IN PROJECT AREA AND lad 11 -' <br /> REMOVE AND/OR RELOCATE SITE APPURTENANCES IN PROJECT' AREA THAT CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE AL,.I PROBLEMS PRIOR TO PROCEEDING cn <br /> O�°Call �1p227�26Q0 <br /> WITH CONSTRUCTION. ° I r _ <br /> IMPACTS THE PROJECT'. Q <br />