Laserfiche WebLink
9. F—'FLL/OVERFILL CONTAINMENT BC- ".S <br /> Facility is Not Equipped With Spill/Grcrfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br /> Test Method Developed By: D Spill Bucket Manufacturer ;Industry Standard D Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum "ydrostatic <br /> ❑Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> rs wwart a as tts luau'j* e n �wssuaaa�x Q <br /> a� wrti vrHw wta�nsasx ; �w�xa =m au <br /> Spill Box# / Spill Box# Q- Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and t�Ale <br /> starting test: <br /> Test Start Time: ,� / 3.5Q <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RO: <br /> Test Duration: tZ <br /> Change in Reading(RFR,): <br /> Pass/Fail Threshold or <br /> Criteria: l <br /> Test Result: Pass ❑Fail �1`,.Pass D Fail ❑ Pass ❑Fail D Pass ❑Fail <br /> Commenis— (include information on repairs made prior to testing, and recommended follow-up for failed tests_) <br /> / f, 5u2E+++tti'1 .{4®nn -J�V �i�5' ����� f� (fin o� �(Aj< C + <br />