Laserfiche WebLink
A IRDA-TEST 12v- "940112 P. 05 <br /> D. Results o£Testing/Servicing <br /> Software Version Installed: <br /> .,. , I, <br /> Complete the fnuowing checRlist: <br /> Xes Q NO Is the audible alarn operational? <br /> es ❑ No* Is the visual alarm operational? <br /> s Q No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> C*Yes C] No" Were all sensors installed at lowest point of secondary contaitunent and positioned s)that other equipment will <br /> not interfere with their proper operation? <br /> ( )Yes O_)o* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? _ <br /> es ( )No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ( }N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply).B Sump/Trench Sensors; p Dispenser Containment Sensors. <br /> Did you confirm positive shutdown due to leaks and sensor failure/discortneetion? QrV s; Q No. <br /> ( } <br /> Yes -)No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> VN/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the z arm tri er? K <br /> ( )Yes* o Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or•other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,belvv. <br /> ( )Yes* o Was liquid found inside any secondary containment systems designed as dry systems" (Check all that apply) ❑ <br /> Product; ❑ Water. If yes,describe causes in Section E,below. <br /> es ❑ No" I Was monitoring system sct-up reviewed to ensure proper settings?Attach set up re ons, if applicable <br /> Yes Q No* I Is all monitogn a ui memo rational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03101 <br />