My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO 1987 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:16:56 PM
Creation date
11/8/2018 10:22:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2007
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\COMPLIANCE INFO 1987 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 1987 - 2007
QuestysRecordDate
7/21/2016 3:39:19 PM
QuestysRecordID
3146929
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A IRDA-TEST 12v- "940112 P. 05 <br /> D. Results o£Testing/Servicing <br /> Software Version Installed: <br /> .,. , I, <br /> Complete the fnuowing checRlist: <br /> Xes Q NO Is the audible alarn operational? <br /> es ❑ No* Is the visual alarm operational? <br /> s Q No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> C*Yes C] No" Were all sensors installed at lowest point of secondary contaitunent and positioned s)that other equipment will <br /> not interfere with their proper operation? <br /> ( )Yes O_)o* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? _ <br /> es ( )No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ( }N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply).B Sump/Trench Sensors; p Dispenser Containment Sensors. <br /> Did you confirm positive shutdown due to leaks and sensor failure/discortneetion? QrV s; Q No. <br /> ( } <br /> Yes -)No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> VN/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the z arm tri er? K <br /> ( )Yes* o Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or•other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,belvv. <br /> ( )Yes* o Was liquid found inside any secondary containment systems designed as dry systems" (Check all that apply) ❑ <br /> Product; ❑ Water. If yes,describe causes in Section E,below. <br /> es ❑ No" I Was monitoring system sct-up reviewed to ensure proper settings?Attach set up re ons, if applicable <br /> Yes Q No* I Is all monitogn a ui memo rational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.