My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO 1987 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:16:56 PM
Creation date
11/8/2018 10:22:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2007
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\COMPLIANCE INFO 1987 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 1987 - 2007
QuestysRecordDate
7/21/2016 3:39:19 PM
QuestysRecordID
3146929
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S' SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ I.NEW PLAN X 2.CHANGE OF INFORMATION Mi'I. <br /> PLAN TYPE J[MONITORJNG IS IDENTICAL FOR ALL UST.AT THIS FACILITY. she <br /> (Check one item oily) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agenev Use Only) <br /> FACILITY NAME / <br /> FACILITY SITE.ADDRESS ZAlyLj. f Mau- CITY <br /> II. EQUIPMENT TESTING AND PRE ENTIVE MAINTENANCE <br /> Slate law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in MM <br /> accordance with the equipment mmwlactureri instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED L ANNUALLY ❑ 99.OTHER(Specify): Min <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram leg.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mln. <br /> I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENTVAULTS) <br /> SECONDARY CONTAINMENT IS'. 0 a.DRY ❑ b.LIQUID FILLED ❑ c UNDER PRESSURE ❑ d.UNDER VACUUM Mu. <br /> PANEL MANUFACTURER: eQ P1 h rZe jn Tse Mla MODEL#: M13. <br /> LEAK SENSOR MANUFACTURER: bM A 'T6 L MI4. MODEL#(S)' L Glia44L S MIs. <br /> ❑ 2.AUTOMATIC TANK GAUGING(AIG)SYSTEM USED TO MONITOR SINGLF WALL TANK(S) <br /> PANEL MANUFACTURER: MI° MODEL#: Mn. <br /> IN-TANK PROBE MANUFACTURER: MI.. MODEL#(S): Min. <br /> LEAK TEST FREQUENCY: E] a.CONTINUOUS C3b.DAILYINIGHTLY ❑ C.WEEKLY MN) <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): MTI. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ C.OTHER(Specify). Mea. Mss. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL.PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mao. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTC)PER 23 CCR§2645 <br /> p TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> �+1 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY i c.OTHER(Specify): Mzu. Mn. <br /> RQ 6.VISUAL MONITORING DONE: 94a.DAILY ❑ b.WEEKLY tawlWra ayr icy apprnvN) <br /> ❑ 99.OTHER(Specify): <br /> M2. <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) MA.. <br /> {� L CONTINUOUS ELECTRONIC MONITORING <br /> �1 OF PIPING SUMP(S)(rRENCH(FS)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: K a.DRY ❑ b.LIQUID FILLED ❑ C.UNDER PRESSURE ❑ d.UNDER VACUUM Mn. <br /> PANEL MANUFACTURER: hryj n rE f Ai M3z MODEL#: _(J�j gn„ Mst. <br /> LEAK SENSOR MANUFACTURER: OM A y-'6♦ Mm MODEL#(S): -Z ( �" /�j(Ljr Mls. <br /> 121— <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e,,TURBINE)SFIUTDOWN7 5 a.YES ❑ Is.NO My'' <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? {Q a.YES ❑ b.NO M10 <br /> �2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND R€S-TRICTS OR SHUTS OFF <br /> PRODUCT'FLOW WREN A LEAK IS ECTED <br /> MLLDMANUFACTURER(s):�16' �,��'� Max. MODEL#(s): s1t''o-"' -sh.In Mtn. <br /> ❑ 3.ELECTRONIC LINE.LEAK DETECTOR(ELLD)THAT ROUTINEIX PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: Mw. MODEL#: Moi. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0,2 g.p,h. ❑ b.MINIMUM ANNUAL 0 1h Mae. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? g P <br /> ❑ a.YES ❑ Is.NO M43. <br /> WILL ELLD F'AILURE/DISCONNECTIONTRlGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ Is.NO Mal <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY b.EVERY 3 YEARS ❑ C.OTHER(Specify) Mos. Mar. <br /> CK 5.VISOAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* Ippf c.MIN.MONTHLY k EACH TIME SYSTEM OPF..RAT'ED•• <br /> •Requim asencs apnoval ••Allmrx3 rd nmiionn of Uabuned ease M41, <br /> ❑ 6.PIPING IS SUCTION PIPING ME[ ALL.REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR*§2636(ax3) only <br /> v lay HSC gssaxrstbp» <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING 1S CONNECTED TO THE UST(,) <br /> ❑ 99.OTHER(Specify) <br /> M4x <br /> I SJCEHDd(07/03)-I/4 <br /> 0723/0.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.