Laserfiche WebLink
SiteAddress:jCYgj" :5 lye+ r/ /df'4�/-T / rtllp I Ut{ L2 (r7' <br /> V f�� Date of Testing/Servicing: <br /> F. In-Tank Gauging/SIR Equipz,fent: M-17beck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> HEJYes KNo* s all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> re all tank gauging probes visually inspected for damage and residues accuracy of system product level readings tested? <br /> s accuracy of system water level readings tested? <br /> re all probes reinstalled properly? <br /> re all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com etc the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check a!!that apply) Simulated leak rate: �p.h.; ❑ 0.1 g.p.h ; ❑ 02 g.p.h. <br /> O'Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Y ❑ No* Was the testing apparatus properly calibratede <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> Cd N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> L')JN/A or disconnected? <br /> ❑ Yes ❑Vo* For electronicLLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> L N/A malfunctions or fails a test? <br /> ❑ Yes ❑ o* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> Ij Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />