Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only w I /�� <br /> ❑ Check this box if no tank gauging or SIR aft <br /> Ip EMU <br /> Is V <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: NOV 04 2015 <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing far ground faults? <br /> ❑ Yes ❑ No" Were all tank gauging probes visually inspected for damage and residue buildup? ENVIRONMLIf L <br /> ❑ Yes ❑ No* Was accuracy of system product level headings tested? -' <br /> ❑ Yes ❑ No" Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No" Were all probes reinstalled property? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(1-1-13): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h; (:10,2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No* For electronic LI-Ds,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ Yes ❑ No" For electronic LLDs,does the turbine automatically shut off N any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No" For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> •In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 87 120 3 26 21 PASS <br /> 91 120 5 25 16 PASS <br /> DSL 130 3 27 18 PASS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />