My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1111
>
2300 - Underground Storage Tank Program
>
PR0506724
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:12:19 AM
Creation date
11/8/2018 10:22:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0506724
PE
2361
FACILITY_ID
FA0007594
FACILITY_NAME
WINE COUNTRY STATION/7-ELEVEN
STREET_NUMBER
1111
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04931056
CURRENT_STATUS
01
SITE_LOCATION
1111 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KETTLEMAN\1111\PR0506724\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
6/27/2018 4:14:35 PM
QuestysRecordID
3926585
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 2 0 2014 <br /> Monitoring System Certification <br /> ENVIRONMENTAL HEALTH <br /> F. In-Tank Gauging/SSR Equipment: ® Check this box iftank gauging is useQ@rNTontrol. <br /> ❑ Check this hnx if w tank gauging or SIR equipment is installed. <br /> This section must be wmpleted if it,tank gauging equipment is used to perform teak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes [3 No* Flan all input wiring been inspected far proper imtry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ Not Was accuracy of system product level readings tested? <br /> ❑ Yes L] No* Was accuracy of syste.n water level readings tested? <br /> ❑ Yos El No* Were all probes minsbdled properly? <br /> ❑ Yes ❑ No" Were all items on the equipment:manufacturer's maintenance checklist completed? <br /> *In the Section N,below,describe how aid when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Cam tete the rollowiu checklist: <br /> H Yes ❑ Nov For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 3 g.ph; ❑0.1 g.p.h; ❑0.2 g.p.li. <br /> ® Yes ❑ No• Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No° Was the testing appamw properly calibrated? <br /> ® Yes ❑ NO For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> p Yes ❑ Nov For electronic LLDs, foes the turbine automatically shut off if the LLD detects a leak? <br /> ® NIA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of rhe monitoring system is disabled <br /> 0 NIA or disconnected? <br /> ❑ Yes ❑ Nov For electronic LLDr, does the turbine automatically shut off if any portion of the munkoring system <br /> ® NIA malfunctions or fails A test? <br /> ❑ Yes O No' For electronic UDs, 'cave all accessible wiring connections been visually inspected? <br /> ® NIA <br /> CK Yes ❑ No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> •In the Section H,blow,describe how rind when these deficiencies were or will be corrected. <br /> H. Comments: <br /> P2RP 't of a <br /> I <br /> V £9699V960Z wnelaled elgeilea e4£'1704L OZ AoN <br />
The URL can be used to link to this page
Your browser does not support the video tag.