| 
								    PROPERTY LINE 175.00' S88° OS' 30"W� 
<br />r 
<br />r .• r/rrr r r r••��• r •r•r�r �-•'-� r r rr�re -® o F�l o 
<br />r r 
<br />' EXISTING VENT RISERS TO - 
<br />REMAIN. REMOVE ANY 
<br />' RISERS NO LONGER IN USE 
<br />NEW 2"0 SINGLE-WALL 
<br />FIBERGLASS VENT LINE 
<br />(SLOPE 1/4" PER FOOT 
<br />MINIMUM UPWARD FROM 
<br />' TANK) 
<br />(2) NEW NDERGROUND DOUBLE-WALL / 
<br />�FIBERGLA S STORAGE TANKS 10' DIAMETER 
<br />& 8' RE INFORCED CONCRETE SLAB ) 
<br />(TANKS RNISHED BY THE DEALER 
<br />ED BY THE DEALER'S 
<br />3 GENERAL CONTRACTOR). ONE TANK 
<br />IS TO BE A 16,000 GALLON TANK 
<br />M DIVIDED INTO 10,000 GALLON REGULAR 
<br />UNLEADED & 6,000 GALLON PREMUM 
<br />UNLEADED. THE OTHER TANK IS TO BE// 
<br />41A 15,000 GALLON TANK DIVIDED INTO// 
<br />8,000 GALLON UNLEADED PLUS & // 
<br />b177,000 GALLON DIESEL FUEL 
<br />,000 
<br />F 
<br />t 
<br />p / N 
<br />V) 
<br />O 
<br />P Q 
<br />In'ul 
<br />LLJ 
<br />:i 
<br />u /x 
<br />u 
<br />3"0 VAPOR 4� 
<br />RECOVERY 
<br />1 MANIFOLD R� 
<br />u� 
<br />I 
<br />'NEW 2"0 DOUBLE-WALL FIBER- 
<br />GLASS PRODUCT PIPING LINES 
<br />w/ 3"0 FIBERGLASS SECONDARY 
<br />u( 
<br />CONTAINMENT PIPE UP SOPE1J 4" 
<br />PER FOOT MINIMUM UPWARD 
<br />FROM TANKS) (TYPICAL) 
<br />M.W. 
<br />b 
<br />E'tiS�NG t0 R 
<br />\O 
<br />EXISTING EASEMENT & WATER SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT UNDERGROUND PIPING GENERAL NOTES 
<br />WELL EQUIPMENT TO REMAIN REQUIRED INSPECTIONS. 
<br />1. SHELL SERVICE STATION SPECIFICATIONS ARE TO BE FOLLOWED 
<br />FOR ALL WORK PERFORMED AT THIS SITE 
<br />ALL APPOINTMENTS FOR INSPECTIONS MUST BE MADE AT LEAST 48 HOURS IN ADVANCE 2. ALL WORK, INCLUDING PLUMBING AND ELECTRICAL, SHALL BE 
<br />FOR THE FOLLOWING: PERFORMED IN ACCORDANCE WITH LOCAL ADOPTED BUILDING 
<br />CODES AND SUPPLEMENTARY ORDINANCES, ALL AS DIRECTED BY 
<br />--' - - PRIMARY AND SECONDARY TANK(S) SHALL BE TESTED PNEUMATICALLY AT 3-5 P.S.I. COMPANY REPRESENTATIVE. 
<br />FOR ONE HOUR; ONE-HALF HOUR FOR PRIMARY TANK AND ONE-HALF HOUR FOR 3. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS AT 
<br />SECONDARY TANK. DOUBLE WALLED TANKS ARE EXEMPT IF ANNULAR SPACE IS THE SITE. NOTIFY COMPANY REPRESENTATIVE OF ANY DISCREPANCIES 
<br />EXISTING CATCH BASIN TO BE I 
<br />RETROFITTED TO INCLUDE NEW 
<br />1.STREAMGUARD" CATCH BASIN 
<br />OIL/SEDIMENT FILTER TYPE 11-0. 
<br />O (TYPICAL OF 4 CATCH BASINS) 
<br />- - _ (FURNISHED & INSTALLED BY THE 
<br />-- 
<br />----------- ----------- - - -- STATION DEALER'S CONTRACTORS) 
<br />-( 
<br />EXISTING UNDERGROUND II 
<br />WASTE OIL TANK & 
<br />CONCRETE SLAB TO REMAIN II ' 
<br />it 
<br />II � 
<br />11 
<br />I O 
<br />P51 
<br />,d 11 EXISTING CANOPY 
<br />GPq0N�p,�N I I TO REMAIN ' 
<br />ZO P II f 
<br />III I 
<br />E 
<br />GON MPtJ 
<br />Ey,S�O ZO V� 
<br />5 
<br />EXISTING CANOPY - 
<br />COLUMN TO REMAIN 
<br />NEW DIESEL DISPENSER - 
<br />(FURNISHED BY THE DEALER 
<br />& INSTALLED BY THE DEALE 
<br />GENERAL CONTRACTOR 
<br />NEW GUARD POST (FURNISHED - 
<br />EXISTING CONCRETE DRIVE SLAB & INSTALLED BY THE DEALER'S 
<br />GENERAL CONTRACTOR) (TYPICAL 
<br />�p TO BE REMOVED .& REPLACED OF 20) 
<br />II ' 
<br />K'Cq w/ NEW 6" REINFORCED 
<br />F CONCRETE DRIVE SLAB -SLOPE II � 
<br />T ENTIRE SLAB TO DRAIN TO NEW 
<br />EXSTNG�ANGPY COLUMN TO II 
<br />2 �S REMAIN (TYPICAL OF 2) CATCH BASIN. II 
<br />NEW 2"0 SINGLE-WALL FIBERGLASS 
<br />/ �O OF,yry VAPOR RECOVERY PIPING (SLOPE II 
<br />1/4' PER FOOT MINIMUM UPWARD 
<br />4 FROM TAN D II 
<br />D I I 
<br />4 ° NEW 2"0 DOUBLE-WALL FIBERGLASS II 
<br />R - 4 PRODUCT PIPING LINES w/ 3"0 
<br />-VR-O FIBERGLASS SECONDARY CONTAINMENT II 
<br />O Tp O PIPE (SLOPE 1/4" PER FOOT MINIMUM 
<br />+ II 
<br />4\ R+ UPWARD FROM TANKS) (TYPICAL) 
<br />]]]] e 4 O I% EXISTING 10" STORM DRAIN 
<br />�4 O I °\. a 8 I 4 II PIPE TO REMAIN 
<br />° N 3 x 2" REDUCERI- 0 
<br />° P - FIIQING (TYPICAL) SEE.1 I1 
<br />4.DE IL THIS PAGE 
<br />°4 e°I NEW 24" SQUARE CATCH BASIN II 
<br />4 w/ TRAFFIC RATED GRATE & 
<br />xI- \ .I SAND/GREASE TRAP PER CITY II 
<br />OF LODI STANDARD PLAN #205 
<br />/ O..I4 a .' e (FURNISHED & INSTALLED BY I I 
<br />THE STATION DEALER'S II EXISTING STORM DRAIN- 
<br />- °_ _ ! - - - - _ _ 4 _ CONTRACTORS) MANHOLE TO REMAIN 
<br />1----J/_Yq_---1 
<br />NEW 3"0 SINGLE -WALL - 
<br />FIBERGLASS VAPOR 
<br />RECOVERY PIPING (SLOPE 
<br />1/4" PER FOOT MINIMUM 
<br />UPWARD FROM TANK) 
<br />0 
<br />_'_II-- - 
<br />I _ --------------- 
<br />_ _ - - - Z = = 
<br />R= 
<br />.O O O 
<br />I'. 
<br />° T 
<br />4 e 
<br />a.4 ° 
<br />(1 e 
<br />EXISTING L 
<br />TO REMAIN 
<br />B] 
<br />I 
<br />-----KEIT 
<br />EXISTING UNDERGROUND 
<br />SANITARY SEWER LINE 
<br />TO REMAIN 
<br />w 
<br />N 
<br />RELOCATED "DRESSER WAYNE" 3 -PRODUCT Q 
<br />GASOLINE DISPENSER w/ CARD READERS, 
<br />3 -HOSES EACH SIDE, & BALANCE SYSTEM r 
<br />(INSTALLED BY THE DEALER'S GENERAL 
<br />CONTRACTOR) (TYPICAL OF 4 DISPENSERS) I� 
<br />i' 30" E Q / 
<br />l 
<br />_ r r �� r r •�•r- - - �r�r�• 
<br />EMAN_ 
<br />71m�7 NOTE! ALL EXISTING ITEMS ARE TO REMAIN 
<br />0 5 10 15 UNLESS NOTED OTHERWISE. 
<br />GRAPHIC SCALE 
<br />+ UNLEADED PLUS 
<br />D DIESEL 
<br />I I NEW CONCRETE 
<br />a 
<br />© SHELL OIL COMPANY, ALL RIGHTS RESERVED 1995. 
<br />MONITORED USING EITHER PRESSURE OR VACUUM TESTING. (ALL EXTERNAL CONNECTIONS 
<br />BETWEEN SITE CONDITIONS AND INFORMATION SHOWN ON DRAWINGS, 
<br />SHALL BE SOAP TESTED WHILE UNDER PRESSURE). 
<br />PRIOR TO COMMENCING WORK. 
<br />PRESSURE PIPING SHALL BE HYDROSTATICALLY TESTED TO 1509 OR PNEUMATICALLY TESTED 
<br />4. 
<br />ALL BACKFILL OF UTILITY TRENCHES TO BE CLEAN WASHED SAND. 
<br />TO 1109 OF MAXIMUM ANTICIPATED SYSTEM PRESSURE BUT NOT LESS THAN 5 LBS. 
<br />5. 
<br />PIPING: A.O. SMITH RED THREAD 11 DOUBLE-WALL (PRODUCT). 
<br />PER SQUARE INCH AT THE HIGHEST POINT OF THE SYSTEM FOR A MINIMUM OF 20 MINUTES. 
<br />SINGLE-WALL (VENT/VAPOR). 
<br />ALL LINES OTHER THAN PRESSURE PIPING SHALL BE PRESSURE TESTED AT NOT LESS THAN 
<br />6. 
<br />CONTRACTOR SHALL PROVIDE A COMPLETE FUNCTIONING FUEL 
<br />3 P.S.I. AND NOT MORE THAN 5 P.S.I. FOR A MINIMUM OF 20 MINUTES AND SOAP TESTED 
<br />DISPENSING SYSTEM MEETING THE LETTER AND INTENT OF THESE 
<br />WHILE UNDER PRESSURE. 
<br />PLANS AND SPECIFICATIONS. 
<br />CONTAINMENT SUMPS SHALL PASS A 24 HOUR LEAK TEST. 
<br />7. 
<br />TANKS: 2-15,000 GALLON XERXES UNDERGROUND DOUBLE- 
<br />WALL FIBERGLASS TANKS (TANKS 10' DIAMETER) 
<br />OVERFILL PROTECTION SHALL BE CAPABLE OF DRAINING LIQUID BACK INTO FUEL TANKS. 
<br />8, 
<br />INSTALL B" REINFORCED CONCRETE SLAB OVER TANKS, SET MANHOLE 
<br />MONITORING SYSTEM SHALL PASS A FUNCTIONAL TEST. THE FUNCTIONAL TEST SHALL CONSIST 
<br />COVERS 1 1/2" ABOVE SLAB. GRADE TO DRAIN. 
<br />OF THE ACTNATION OF THE ALARM VIA THE MONITORING PROBES/SENSORS. 
<br />9, 
<br />ALL FITTINGS AND OPENINGS SHALL BE SECONDARILY CONTAINED 
<br />FINAL INSPECTION AND APPROVAL TO OPERATE WILL BE GRANTED AFTER THE ABOVE 
<br />PER TANK MANUFACTURERS SPECIFICATIONS. 
<br />REQUIREMENTS ARE SATISFIED AND A HARD COPY OF THE PRECISION TEST IS SUBMITTED 
<br />10. 
<br />ALL FILL BOXES TO BE 5 GALLONS MINIMUM & WATERTIGHT, 
<br />TO INSPECTOR AT SITE. 
<br />1" ABOVE SURFACE. (TYPICAL FOR PHASE i VAPOR RECOVERY) 
<br />THE CONTRACTOR'S APPROVED PRINTSET OF THE UST INSTALLATION SHALL BE KEPT AT THE JOB SITE AND 
<br />11. 
<br />ALL MANHOLE COVERS TO BE WATERTIGHT. 
<br />MUST BE SHOWN TO THE INSPECTOR UPON REQUEST. IN ADDITION, THE LOCAL FIRE DEPARTMENT SHALL 
<br />APPROVE UST INSTALLATION PRIOR TO COMMENCEMENT OF WORK. 12, 
<br />IF YOU NEED FURTHER ASSISTANCE, OR WISH TO SCHEDULE AN APPOINTMENT TO DISCUSS THE PLAN REVIEWI3. 
<br />INSTALL 4-3/4 H.P. SUB -PUMPS WITH A.P.I. DETECTORS, 
<br />INSTALL 4-2"0 DOUBLEWALL FIBERGLASS UNDERGROUND PRODUCT 
<br />OR FIELD INSPECTION, PLEASE CONTACT OUR UNDERGROUND STORAGE TANK STAFF AT (209) 463-3427. 
<br />LINES WITH PRESSURE MONITOR (FOR QUICK SHUT -DOWN), SEE 
<br />EQUIPMENT LIST & SPECIFICATIONS FOR COMPLETE EQUIPMENT 
<br />LISTING. ATTACH LIQUID PROBE LEAK MONITOR, WITH PIPING SUMP 
<br />TO TANKS. 
<br />I 
<br />14. 
<br />INSTALL 1-3"0 UNDERGROUND SINGLE-WALL FIBERGLASS VAPOR 
<br />RECOVERY LINE, MANIFOLD FROM MULTI -PRODUCT DISPENSERS 
<br />LJ 
<br />TO REGULAR UNLEADED TANK. 
<br />0 
<br />15. 
<br />INSTALL 2-2"0 UNDERGROUND SINGLEWALL FIBERGLASS VENT 
<br />LINES (ONE FROM EACH TANK TO VENT RISERS.) 
<br />-_ 
<br />SLOPE 1/4" PER FOOT MINIMUM BACK TO TANKS. 
<br />16. 
<br />SLOPE ALL NEW PRODUCT/VAPOR RECOVERY PIPING 1/4" 
<br />PER FOOT MINIMUM BACK TO TANKS. 
<br />O 
<br />Z 
<br />17. 
<br />EXCAVATION FOR TANKS SHALL BE PER OSHA REQUIRMENTS. 
<br />18. 
<br />PROVIDE DEADMEN & STRAPS PER SHELL STANDARDS. 
<br />' 
<br />pC) 
<br />19. 
<br />PROVIDE TANK SHORING. (NOTE, 10' DIAMETER TANKS) 
<br />1 
<br />M 
<br />20. 
<br />GENERAL CONTRACTOR SHALL FURNISH & INSTALL DEADMAN 
<br />HOLD DOWNS FOR ALL TANKS IN ACCORDANCE WITH DETAILS 
<br />r 
<br />!� 
<br />ON TANK DRAWINGS. IT IS CRITICAL THAT YOU MEET THE CROSS 
<br />SECTIONAL DESIGN & REINFORCEMENT REQUIREMENTS. IF YOU 
<br />W 
<br />W 
<br />ELECT TO USE PRE -FABRICATED CONCRETE DEADMAN HOLD DOWN 
<br />Z 
<br />UNITS, SHELL REQUIRES ENGINEERING CALCULATIONS TO CONFIRM 
<br />THAT SYSTEM IS EQUAL TO SHELL'S DESIGN. 
<br />J 
<br />W i 
<br />21. 
<br />ALL TESTING REQUIREMENTS (TANKS, LINES, BLOCKAGE TEST, 
<br />H 
<br />PRESSURE DECAL, CALIBRATION, ETC.) SHALL BE THE RESPONSIBILITY 
<br />cr. 
<br />OF THE GENERAL CONTRACTOR & INCLUDED IN BASE BID, NO 
<br />w 
<br />LL 
<br />f 
<br />F 
<br />EXCEPTIONS. 
<br />0 
<br />( 
<br />22. 
<br />JTH-LINE PRESSURE MONITOR NOT REQUIRED 
<br />IL 
<br />CITY OF LODI 
<br />H� 
<br />FIRE DEPARTMENT NOTES 
<br />1. 
<br />ALL UNDERGROUND STORAGE TANKS TO COMPLY WITH SAN JOAQUIN 
<br />Z' 
<br />COUNTRY ENVIRONMENTAL HEALTH & CITY OF LODI. 
<br />2. 
<br />PERMITS TO INSTALL UNDERGROUND TANKS SHALL BE OBTAINED FROM 
<br />THE FIRE DEPARTMENT. 
<br />3. 
<br />EMERGENCY SHUT-OFF VALVE TO BE CLEARLY LABELED. 
<br />4. 
<br />NO SMOKING SIGNS TO BE CLEARLY VISIBLE. 
<br />•�� 
<br />5. 
<br />BUILDING PERMIT MAY BE ISSUED WITHOUT ANY FURTHER ACTION BY 
<br />r 
<br />THE FIRE DEPARTMENT. 
<br />I 
<br />6. 
<br />NO FIRES SHALL BE PERMITTED TO BURN ON THE CONSTRUCTION 
<br />SITE FOR ANY PURPOSE. THE USES OF DEVICES. OR TOOLS PRODUCING 
<br />A FLAME WHEN USED IN AN APPROVED MANNER AND NECESSARY FOR 
<br />THE CONSTRUCTION OF THE BUILDING WILL BE PERMITTED, 
<br />I LEGEND 
<br />7. 
<br />WHEN EXPOSED TO PROBABLE VEHICULAR DAMAGE DUE TO PROXIMITY 
<br />f NEW 2"0 DOUBLE-WALL FIBER 
<br />TO ALLEYS, DRIVEWAYS OR PARKING AREAS, ABOVEGROUND GAS 
<br />GLASS PRODUCT PIPING LINES 
<br />METERS, REGULATORS, AND PIPING SHALL BE SUITABLY PROTECTED. 
<br />w/ FIBERGLASS SECONDARY 
<br />CONTAINMENT 
<br />ANMENT PIPE (SLOPE 1/4" 
<br />8 
<br />COMMERCIAL DUMPSTERS AND CONTAINERS WITH AN INDIVIDUAL 
<br />PER FOOT MINIMUM UPWARD 
<br />I 
<br />CAPACITY OF 1.5 CUBIC YARDS OR GREATER SHALL NOT BE STORED 
<br />FROM TANKS) 
<br />OR PLACED WITHIN 5 FEET OF COMBUSTIBLE WALLS, OPENINGS, OR 
<br />COMBUSTIBLE ROOM EAVES LINES UNLESS DUMPSTERS AND CONTAINERS 
<br />°_ 
<br />ARE PROTECTED BY AN AUTOMATIC SPRINKLER SYSTEM. 
<br />NEW UNDERGROUND SINGLE- 
<br />ALL CONTAINERS IN WHICH COMBUSTIBLE TRASH, WASTEPAPER, OR 
<br />WALL FIBERGLASS VENT/VAPOR 
<br />RUBBISH IS KEPT OR STORED SHALL BE MADE OF METAL AND EQUIPPED 
<br />p / 
<br />LINES 2"0 OR 3"0 (SLOPE 1/4" 
<br />WITH ATIGHT-FITTING METAL LID WHEN LOCATED WITHIN A BUILDING OR 
<br />O// 
<br />PER 12' MINIMUM UPWARD FROM 
<br />ADJACENT TO A BUILDING. 
<br />TANK). PIPING TO BE 3" AFTER 
<br />MANIFOLD OF THE VAPOR 
<br />9. 
<br />APPROVED NUMBERS OR ADDRESSES SHALL BE PLACED IN SUCH A 
<br />RECOVERY LINES. 
<br />POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET 
<br />OR READ FRONTING THE PROPERTY. SAID NUMBERS SHALL CONTRAST 
<br />WITH THEIR BACKGROUND AND BE OF THE MINIMUM HEIGHT AS LISTED 
<br />VR VAPOR RETURN 
<br />IN THE FOLLOWING TABLE, 
<br />DISTANCE TO BUILDING ADDRESS SIZE HEIGHT 
<br />MEASURED FROM BACK OF WALK 
<br />R REGULAR UNLEADED 
<br />25 FEET 3 INCHES 
<br />26-40 FEET 5 INCHES 
<br />41-55 FEET 9 INCHES 
<br />P PREMIUM UNLEADED 
<br />I 
<br />OVER 55 FEET 12 INCHES 
<br />l 
<br />_ r r �� r r •�•r- - - �r�r�• 
<br />EMAN_ 
<br />71m�7 NOTE! ALL EXISTING ITEMS ARE TO REMAIN 
<br />0 5 10 15 UNLESS NOTED OTHERWISE. 
<br />GRAPHIC SCALE 
<br />+ UNLEADED PLUS 
<br />D DIESEL 
<br />I I NEW CONCRETE 
<br />a 
<br />© SHELL OIL COMPANY, ALL RIGHTS RESERVED 1995. 
<br />
								 |