Laserfiche WebLink
, <br /> 19. ;_11,\ Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> /1 Restricts delivery of flow to tank [Section 2635 (b) (2) (8) or (C)], or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)3, or <br /> (B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) N Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br /> ren <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pulps installed below grade. <br /> N Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) Kli Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) underground primary piping will meet all of the following requirements <br /> Primary piping in contact with hazardous substance under normalo ration conditions shalt be: <br /> installed inside a secondary containment system in the form of:9secondary pipe—Vault or <br /> _Lined trench to be sloped to a collection sump at the low point of the piping. <br /> Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and vot untary consensus standards.. <br /> Lined trench used as secondary containment <br /> AI/ Material compatible with the substance stored. <br /> F�= <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary contairment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic lige leak dettors wilt be installed on pressurized piping <br /> Manufacturer: llt' aq ^i`� Model: ��($T7N(x -(D RIsYVIj�(N <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. State water Resources ControL Board "Facility (A)' and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. I p <br /> 22. what is the approximate depth to ground water: !GN '("f7 ISI- µ <br /> G <br /> (include source of information - borehole logs, monitoring well data, water <br /> studies, etc.) <br /> 131-\Sk�,0 oN wwi:-21:JC2k ori VoE� wall rpimc Ik &f Ik0bXalby <br /> 23. X Total number of tanks an site after installation: 3 `- <br /> 24. County/City Fire District and Building Department notified. <br /> 25. X In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to s it a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or Aerator nowledge is responsibility for workplan submittal by signature and date below. <br /> Name Title (—I( IL (��A Date <br /> CONDITIONS OF APPROVAL: <br /> 8 <br />