My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> 5. All primary containment including any integral secondary containment system must be certified by an <br /> independent testing organization and labeled as required by the organization (California Code of <br /> Regulations Title 23 Chapter 16 (CCR) 2631(b); UL, ULC, ANSI, API, ASTM, etc. See CCR Table B <br /> for complete list.). Pursuant to Underwriters Laboratories Inc. (UL) listing requirements, only those <br /> products bearing the UL mark will be considered listed. ANY PART/PRODUCT NOT MARKED WITH <br /> THE UL LABEL OR ANOTHER LISTED TESTING ORGANIZATION WILL BE REJECTED. All <br /> secondary containment system which is not an integral part of the primary containment shall be <br /> designed and constructed according to an engineering specification approved by a state registered <br /> professional engineer or according to a nationally recognized industry code or engineering standard, <br /> per CCR 2631(d). <br /> 6. Contact Elena Manzo, Lead Sr. RENS, at (209) 953-7699 for the following inspections. See the <br /> permit inspection checklist more information. All appointments must be scheduled 48 hours in <br /> advance. <br /> ❑ Inspection of tank vacuum gauge or inspection for brine leaks prior to tank placement in <br /> excavation. All tank's pre-installation tests shall be performed according to tank's manufacturer <br /> instructions. Manufacturer supplied tank installation checklist must be provided to the EHD prior to <br /> final inspection. <br /> ❑ Verification of tank set, anchorage, appropriate backfill, and appropriate additional corrosion <br /> protection of tank anchors (turnbuckles, eye bolts, etc.). Corrosion protection is required on all <br /> exposed metal prior to covering. <br /> ❑ Test of the primary USTs containment according to manufacturer's specifications. <br /> ❑ Primary piping soap test of all piping and penetrations (product, vapor recovery, and vent): One- <br /> hour pneumatic pressure test at 110% of operating pressure, or 40 psi, whichever is greater. <br /> ❑ Secondary piping slope, at 1/8 inch per foot or greater, to a containment sump with an <br /> audible/visual alarm. <br /> ❑ Secondary piping soap test of all piping and penetrations (product, vapor recovery, and vent): <br /> One-hour pressure test at the manufacturer's recommended specification. <br /> ❑ Verification of all pipe setbacks and burial depth according to the manufacturer's installation <br /> instructions. Verification of appropriate backfill. <br /> ❑ Integrity testing of all sumps per the manufacturer's installation instructions prior to backfill, and <br /> brine type verification and brine addition prior to backfill. <br /> ❑ Verification of leak monitoring communication for all installed vacuum, pressure, or hydrostatic <br /> (VPH) components including piping, sumps, under dispenser containment sumps (UDCs), and all <br /> chase/crossovers; communication at end point(s) of each vacuum zone termination must be <br /> verified. All appropriate connections to facilitate communication testing must be present. <br /> ❑ Verification of the dispenser footprints contained by the UDCs; any potential leaks from piping and <br /> fuel filters must drain directly into UDCs. <br /> ❑ Enhanced Leak Detection (ELD) testing after facility is in operating condition: Appropriate test <br /> notification, tester certifications, and test method disclosure is required. <br /> ❑ VPH components installation verification (shroud boots for spill containers, band clamps for spill <br /> containers, fill, vent and STP sump rubber gaskets or clamps, etc.). <br /> ❑ Overfill prevention verification prior to first fuel delivery: Measurement of drop tubes to verify 95% <br /> tank volume shut off and/or verification that external audible/visual alarm activates when tank is <br /> 90% full. An accurate drop tube and tank level gauge calculation must be provided to the EHD <br /> prior to scheduling an overfill prevention verification inspection. <br /> ❑ Spill bucket test prior to first fuel delivery: Verify minimum 5-gallon capacity and pass a one hour <br /> hydrostatic test(or equivalent). Proper drainage method must be verified. <br /> 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.