My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 10:24:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHURCH\800\PR0231063\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/2/2015 9:31:08 PM
QuestysRecordID
135920
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
681
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMERICAN L,,, ✓IRONMENTAL MANAGEME. - ' CORPORATION <br /> Project Gold Bond Job No. 80260 BORING MW2 Sheet.1of 2 <br /> Date Started 12/16/88 Completed 12/16/88 Surface Elevation 98.60 it.- <br /> Total <br /> -Total Depth 31.5 ft. Location Stockton <br /> Logged By Mike Stephens Drilled By SDectn� <br /> Remarks based on artificial datum point, site bench mark set at 100.00 feet <br /> E F D F SAMPLE G L <br /> LE EE R <br /> E E P E T N B P D R R A G EQUIPMENT <br /> V T T T Y U L E E A E P SAMPLE DESCRIPTION INSTALLED <br /> A H P M 0R P N C H <br /> T E B W T G O 1 <br /> 1 E S F H E V C <br /> 0 R T R <br /> N Y <br /> o <br /> % Brown (5 YR 6/4), silty sand, SM. Dry, loose. <br /> 3'of base gravel. ' ° • "' <br /> •'p r. O i <br /> C o • ° . <br /> 0 °. <br /> NT Gray, brown, black, rock asphalt, brick, and <br /> T 100 e;; sand. Fill material. Dry, loose. • • °, <br /> N oo ° •e ,o <br /> 4 U e '.�•do <br /> O <br /> U _ Gray (5YR 3/2), sandy silt, ML Very stiff, dry. °' a re Ir• <br /> e • <br /> 0 a 0 1 <br /> r, p <br /> — R <br /> — 8 N 10090 G <br /> Reddish brown, clayey silt, ML Very stiff, <br /> slightly moist. <br /> ° r e p/ <br /> o r• s, i <br /> °° • °° �° <br /> r • e ° <br /> __ a ••° <br /> Grayish brown (5,YR 3/2), slightly silty clay, o •'o e <br /> CL Very stiff, moist. • ° <br /> o• <br /> 80 50 a °° '• <br /> ---20 <br /> °at°ozg°xe ..ee.J <br />
The URL can be used to link to this page
Your browser does not support the video tag.