Laserfiche WebLink
17. If aim rcial, indicate the type, whether neighborhood, city or regionally <br /> oriented, square footage of sales area, and loading facilities. Not applicable <br /> 18. If industrial, indicate type, estimated employment per shift , and loading <br /> facilities. Not applicable <br /> 19. If institutional, indicate the major function, estimated employment per <br /> shift , estimated occupancy, loading facilities, and community benefits to <br /> be derived from the project. Not applicable <br /> 20. If the project involves a variance, conditional use or rezoning applica- <br /> tion, state this and indicate clearly why the application is required. <br /> Are the following items applicable to the project or its effects? Discuss below <br /> all itens checked yes (attach additional sheets as necessary) . <br /> Yes No <br /> 21 . Change in existing features of any bays, tidelands, beaches, X <br /> or hills, or substantial alteration of ground contours. <br /> 22. Change in scenic views or vistas from existing residential X <br /> areas or public lands or roads. <br /> 23. Change in pattern, scale or character of general area of X <br /> project. <br /> 24. Significant amounts of solid waste or litter. X <br /> 25. Change in dust, ash, snoke, fumes or odors in vicinity. X <br /> 26. Change in ocean, bay, lake, strum or ground water quality or X <br /> quantity, or alteration of existing drainage patterns. <br /> 27. Substantial change in existing noise or vibration levels in X <br /> the vicinity. <br /> 28. Site on filled land or on slope of 10 percent or more. X <br /> 29. Use of disposal of potentially hazardous materials, such as X <br /> toxic substances, flanables or explosives. <br /> 30. Substantial change in demand for municipal services (police, IL- <br /> fire, water, sewage, etc.) . <br /> 31. Substantially increase fossil fuel consumption (electricity, X <br /> oil, natural gas, etc.) . <br /> 32. Relationship to a larger project or series of projects. X <br /> Environmental Setting <br /> 33. Describe the project site as it exists before the project, including infor- <br /> mation on topography, soil stability, plants and animals, and any cultural, <br /> historical or scenic aspects. Describe any existing structures on the <br /> 286 <br />