My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 10:24:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHURCH\800\PR0231063\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/2/2015 9:31:08 PM
QuestysRecordID
135920
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
681
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPMI% I <br /> ENVIBONIMTAL CH=I3r FORM <br /> (To Be Completed By Lead Agency) <br /> I. Background <br /> 1. Name of Proponent GOLD BOND BUILDING PRODUCTS, INC. <br /> 2. Address and Phone Number of Proponent <br /> 2001 Rexford Road, Charlotte, NC 28211 <br /> 3. Date of Checklist Submitted <br /> 4. Agency Requiring Checklist Central Valley Regional Water Quality Control Board <br /> 5. Name of Proposal, if applicable Monitoring variance for #6 fuel <br /> underground storage tank. <br /> II. Environmental Impacts <br /> (Explanations of all "yes" and "maybe" answers are required on attached <br /> sheets.) <br /> Yes Maybe No <br /> 1. Barth. Will the proposal result in: <br /> a. Unstable earth conditions or in changes in <br /> geologic substructures? X <br /> b. Disruptions, displacements, compaction or <br /> overcovering of the soil? X <br /> c. Change in topography or ground surface <br /> relief features? X <br /> d. The destruction, covering or modification <br /> of any unique geologic or physical features? X <br /> e. Any increase in wind or water erosion of <br /> soils, either on or off the site? X <br /> f. Changes in deposition or erosion of beach <br /> sands, or changes in siltation, deposition or <br /> erosion which may modify the channel of a <br /> river or stream or the bed of the ocean or <br /> any bay, inlet or lake? X <br /> g. Exposure of people or property to geologic <br /> hazards such as earthquakes, landslides, <br /> mudslides, ground failure, or similar hazards? X <br /> 288 <br />
The URL can be used to link to this page
Your browser does not support the video tag.