My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
800
>
2300 - Underground Storage Tank Program
>
PR0231063
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 10:24:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231063
PE
2381
FACILITY_ID
FA0002715
FACILITY_NAME
NEWARK RECYCLED FIBERS
STREET_NUMBER
800
Direction
W
STREET_NAME
CHURCH
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14523004
CURRENT_STATUS
02
SITE_LOCATION
800 W CHURCH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHURCH\800\PR0231063\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/2/2015 9:31:08 PM
QuestysRecordID
135920
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
681
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
end caps taped with silver duct tape, labeled, and placed in an ice chest containing dry ice <br /> and kept frozen for transport to the analytical laboratory for chemical analyses. <br /> All samples collected will be labeled with the sample identifier, location, sampler's name, <br /> time and date of sample collection, and analyses requested using a black indelible marking <br /> pen. All samples collected will be recorded on a Sample Management/Chain of Custody <br /> form which will track the sample from time of collection to delivery at the analytical <br /> laboratory. Appendix F presents the proposed sample label and Sample <br /> Management/Chain of Custody form that will be utilized. <br /> Prior to and following each subsequent soil sampling event, all downhole sampling <br /> equipment will be cleaned. Cleaning will consist of removing solid material from the <br /> sampling equipment using clear water and a plastic bristle brush, washing the sampling <br /> equipment in a mixture of clear water and Liquinox or Alconox, rinsing the sampling <br /> equipment in clear water, rinsing with deionized water, and allowed to air dry. <br /> Accumulated washwaters will be combined with the accumulated rinsate generated by <br /> borehole drilling equipment cleaning. All boreholes upon completion will be filled with a <br /> cement slurry mix. Borehole filling will be done in the presence of a representative of the <br /> SJLHD. <br /> Soil samples will be analyzed for Total Petroleum Hydrocarbons (TPH) and grease. <br /> Table 2 presents the analytical protocol. <br /> TABLE 2 <br /> ANALYTICAL PROTOCOL <br /> Analytical <br /> Constituent Container Preservation Method <br /> TPH Brass liner Frozen EPA 8015 (modified) <br /> Oil & Grease Brass liner Frozen EPA 418.1 <br /> rl8ol0](ms) Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.