Laserfiche WebLink
Since the courtyard tanks and sump, and the underground pt eline connecting the 5300 <br /> barrel tank with the courtyard tanks will no longer pose a soil/groundwater contamination <br /> problem, all variance requirements requested by the Regional Water Quality Control <br /> Board have now been complied with. A workplan will be submitted to the SJLHD before <br /> proceeding with the closure of the courtyard tanks and sump, and the closure of the <br /> pipeline. <br /> If you have any questions concerning this report please call myself or Mike Stephens at <br /> 364-8872. <br /> Sin erely, <br /> aures F. Frumm, R.G. <br /> Regional Manager <br /> Engineering Division <br /> MS/ljr <br /> llgol-02(ms) <br />