Laserfiche WebLink
INTRODUCTION <br /> ' This report presents the proposed plan for monitoring three <br /> underground storage tanks at the Gold Bond Building Products <br /> _ facility located in Stockton, California (see Attachment 1, Site <br /> Map). The three tanks in question consist of two 90 barrel <br /> (approximatley 3 , 300 gallon) tanks , and one 5 , 500 barrel <br /> (approximately231 ,00 gallon) tank, which store No. 6 fuel oil <br /> (Bunker Fuel). Tank locations are shown on Attachment 2, Site <br /> Plan. <br /> Proposed monitoring will be accomplished utilizing ground water <br /> sampling and laboratory analysis. Vadose zone monitoring is not <br /> proposed due to the presence of shallow groundwater and the low <br /> volatility of the No. 6 fuel oil. <br /> 1 <br />