My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 10:48:40 AM
Creation date
11/8/2018 10:24:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
6/15/2018 5:34:21 PM
QuestysRecordID
3916228
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: Inches <br />UDC # 9/10 <br />UDC # 11/12 <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />31" <br />31" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />5" <br />5" <br />Condition of UDC prior to <br />testing: <br />Fair <br />Fair <br />Portion of UDC Tested <br />4" Above highest penetration <br />4" Above highest penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />N/A <br />N/A <br />Turbine shutdown response time <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ❑ No p NA <br />❑ Yes ❑ No 2 NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No p NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />test <br />15 minutes <br />15 minutes <br />-starting <br />Test Start Time: <br />12:08pm <br />12:08pm <br />Initial Reading (R,): <br />3.99817 Inches <br />0.85718 Inches <br />Inches <br />Inches <br />Test End Time: <br />12:23pm <br />12:23pm <br />Final Reading (RF): <br />3.99845 Inches <br />0.85697 Inches <br />Inches <br />Inches <br />Test Duration: <br />15 mins <br />15 mins <br />in Reading (RF-Ri): <br />0.00028 <br />0.00021 <br />-Change <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />Test Result: <br />E Pass ❑ Fail <br />p Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing'? <br />p Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing'? <br />m Yes ❑ No ❑ NA <br />p Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments — (include infinrmation on repairs made prior to testing, and recommended follow-up for failed tests) <br />� D <br />JUL 20 2M <br />c,_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.