My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:24 AM
Creation date
11/8/2018 10:25:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0516736
PE
2361
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2802 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\COUNTRY CLUB\2802\PR0516736\COMPLIANCE INFO MARCH 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO MARCH 2016 - PRESENT
QuestysRecordDate
1/18/2018 5:13:03 PM
QuestysRecordID
3117835
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-Page 3 of J FEB 18 2015 <br /> NVIRON_ MENTA_ , <br /> Site Address: 2808 Country Club Blvd. Date of Testing/Servicing: 1120(15 <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com le te the following checklist: <br /> L0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 No* Was accuracy of system product level readings tested? <br /> 0 No* Was accuracy of system water level readings tested? <br /> 0 No* Were all probes reinstalled properly? <br /> 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *Ur Section H below,describe how and when these deficiencies"ere or will be corrected. <br /> G. Line Leak Detectors(LLD): 0 Check this box if LLD's are not installed. <br /> Com tete the followingchecklist: <br /> ® l'es 0 No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> 0 N/A (Check all that apply) Simulated leak rate: a 3 g.p.h.(1.); 0 0.1 g.p.h.(2.); 0 0.2 g.p.h.(2.). <br /> Notes: I. Required for equipment start-up certification gad annual certification. <br /> 2. Unless mandated b local agency,certification required only for electronic LLD start-u . <br /> ® Yes 0 No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> ® Yes 0 No* Was the testing apparatus properly calibrated? <br /> 0 Yes 0 No* For mechanical LLD's,does the LLD restrict product Flow if it detects a leak? <br /> ® N/A <br /> ® Yes 0 No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> ® Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> ® Yes 0 No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 0 N/A malfunctions or fails a test? <br /> ® Yes 0 No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> ® Yes 0 No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> "In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: 87 has 2 Turbines with PLLD's. <br />
The URL can be used to link to this page
Your browser does not support the video tag.