Laserfiche WebLink
7 <br /> Monitoring System Certification <br /> JUN 15 2017 UST Monitoring Site Plan <br /> Site Address: SRH US GASOLINE 749 E.CHARTER WAY STOCKTON CA 96206 <br /> ENVIROWF-- <br /> . . .DEPARTMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . @: . <br /> . . . . . . . . . . . . . CAS . <br /> TLs <br /> . . . . . . . . . . . . . . . . . . . . . . . . aso <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> A F V <br /> C) <br /> . DIE. KEYA=ANNULAR <br /> F=FILLS <br /> T=TURBINE <br /> P=PROBE <br /> V=VAPOR <br /> T . . . . . . . . . . X=SUMP SENSOR <br /> A F v . . . . . . . . . . . . . . . . . . . . . L=Leak Detector <br /> x . 87 . . . . . . . . . . M=Manway <br /> . . . . . . . . . . . . . . . . . . . . . . . . B=Brine Sensor <br /> . . . . . . . . . . . . . I=Smart Sensor <br /> S=STP <br /> . . . . . . . . . . . . . . C=Floats&Chains <br /> E=E Stop <br /> T <br /> A F V .91 . <br /> . �. �. . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . o a <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> CHARTER WAY <br /> Date map was drawn 2017 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />