Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
CLIENT: <br /> CAUMA. TANK EXCAVATION-NOTE: GROUND WATER LEVEL NOTE: <br /> POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND &2 "/ bp <br /> NEW UTILITIES PRIOR TO CONSTRUCTION. SEE VjtLay_. 1QNLULjRQ TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED <br /> TE 'THE EXISTING <br /> WATER, STORM, AND "AS-NITABURY SEWER SERVICE ILT" RECORDS. THE GENERAL CONTRACTOR SHALL.SHOWN IS APPROXIMATE, BASED ON FOLLOWING THE RECOMMENDATIONS OF <br /> FIELD SURVEYS AND " THE SOILS REPORT. 'TANKS A SOILS REPORT OF "THIS SITE LOCATION HAS REVEALED THAT GROUNDWATER <br /> EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED WAS NOT ENCOUNTERED BELOW THE GROUND SURFACE WITH A MAXIMUM <br /> VACUUM MONITOR ZONES SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING EXPLORED DEPTH OF 50-5 FEEF. TANKS SNAIL BE INSTALLED WITH <br /> "POTHOLE" THE EXisnNG UTILITIES TO VERIFY THE DIAMETER AND LOCATION (INCL, (SEE SHEET G.O.5 FOR VACUUM DIAGRAM) <br /> ELEVATIONS) PRIOR TO CONSTRUCTION, ANY DISCREPANCIES IN THE LOCATION OF PRODUCT CONTRACTOR, HIGH WATER TABLE IS ANTICIPATED. CONTRACTOR TO SHORE CONCRETE DEADMEN AND FILTER FABRIC PER MANUFACTURERS' GUIDELINES. v <br /> THE EXISTING PIPE OR INCOMPATIBILITY OF THE DESIGN SHALL BE BROUGHT TO "MEAND DEWATER TANK HOLE EXCAVATION. FOLLOW TANK MANUFACTURER'S <br /> IMMEDIATE ATTENTION OF THE OWNERS REPRESENTATIVE, AND OWNERS CIVIL PLLD PIPE LENGHTS 1 87 UNLEADED PRODUCT INSTALLATION INSTRUCTIONS FOR WET HOLE TANK INSTALLATION. <br /> ill <br /> ENGINEER, <br /> 87 UNLEADED 309' 2 87 UNLEADED VENT <br /> 91 PREMIUM 247' 3 VAPOR LINE (INSIDE 87 SUMP) SOILS REPORT BY: <br /> UWY CONFUcr W)TE. <br /> 4 91 PREMIUM PRODUCT SALFIA I-NGINEFRINC GROUP, INC, <br /> CAUTM. 4/29 W. JACQUE1 YN AVENUE FRESNO, CA 93/22 <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, 5 91 PREMIUM VENT PHONE (599) 271 -9700 <br /> AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT 10 SUE A. MONTES, POF <br /> BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL CaN Tol Free RFPORT FILE # 4--21"E,-1064 <br /> LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE GALLING UTILITY LOCATE <br /> 0 DECEMBER 10,2015 <br /> 1 (800) 227-2600 AND -MEN POT HOLING ALL, OF THE EXISTING UTILITIES AT 1 (800) 227-2600 <br /> LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT TWO <br /> CONFLICTS EXIST, LOCATIONS OF SAID UTILITIES AS SHOWN ON THESE PLANS ARE WORKING DAYS <br /> BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. BEFORE YOU jj <br /> IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL. CONSULT .THE OWNERS CIVIL DIG <br /> ENGINEER TO RESOLVE.' ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTIRUCITON. IN <br /> GENERAL NOTES <br /> PIPING LEGEND ARCO <br /> FIBERGLASS PRODUCT PIPING <br /> FIBERGLASS VAPOR RECOVERY PIPING BF WWT ODAST FfODUM LLC <br /> 7- ---- - - ------------ <br /> FIBERGLASS VENT" PIPING <br /> ZA <br /> NOTE: <br /> CONTRACTOR ASSUMES RESPONSIBILITY 10 ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN INTENT AND 'THE CONTRACTOR <br /> IS PERMITTED 'TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD CONDITIONS AND INSTALLATION TECHNIQUES, <br /> 24' CATCH BkSINVEU4 pj q_Jr,TQ--- PZ,'�pWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER FOOT PREFERRED, <br /> LOTTED GRATE A-2- "N" ` <br /> ti <br /> SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT <br /> PIPE, VENT AND VAPOR RECOVERY SHALL BE SINGLE WALL., UNLESS REQUIRED BY LOCAL JURISDICTION, <br /> INSTALL DOUBLE WALL FIBERGLASS TANKS MITI CONTINUOLJS MONITORING OF HYDROSTATIC ANNULAR SPACES BY "VEEDER ROOT- TLS--35O PLUS TANK <br /> . ...... ---------- AND PIPING MONITOR SYSTEM. <br /> ALL.. "TANK. SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY "VEEDER ROOT" LIQUID SENSORS <br /> girl 0 <br /> - R S <br /> TIED INTO THE ri_S-350 13 'TANK INSTALLATION SHALL BE IN <br /> 50 PLUS TANK & PIPING MONITOR SYSTEM, TANKS TO BE SET MIN. 60" BELOW FINISH GRADE. <br /> L <br /> ACCORDANCE MITI MANUrX URER'S INSTALLATION INSTRUCTIONS, <br /> CD INSTALL A CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN WITH A CO <br /> 24. CATCH BASIN 1-1/2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION. CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION <br /> W1 SCUD LID DETAILS AND SPECIAL, REQUIREMENTS, SHOWN ON DETAILS, <br /> E <br /> 7- SPH r- <br /> PAVING, TY <br /> NEW A N G%%k <br /> INSTALL 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS. INSTALL ALUMINUM FILL DROP TUBES. <br /> INS <br /> -CALL. 4" EVR PHASE I APPROVED DUAL. POINT STAGE I VAPORME RECOVERY ADAPTERS AND CAPS <br /> 18215 72ND AVENUE SOUTH <br /> KENT, WA 98032 <br /> INSTALLC5 7 ONE (1) 2 FIR VARIABLE SPEED TURBINES IN 'ME ?�0,000 GALLON REGULAR UNLEADED TANK (TANK #1)� A <br /> INSTALL ONE (1) 2 HP VARIABLE SPEED TURBINE IN THE 0 06O' CL UNLEADED PREMIUM TANK (TANK #2), (425)251-6222 <br /> TURBINE SYSTEMS TO BE EQUIPPED WITH 3 GPI-I ELE <br /> 2N FLA DETECTION, LEAK DETECTORS ARE TO BE FIESTED FOR -THE 3 CPH LEAK <br /> DETECTION PRIOR TO START UP, CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER. SET <br /> TURBINE INTAKES AT 5* FROM BOTTOM OF TANKS, TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS TO LABEL RJRE31NES (425)251 -8782 FAX <br /> I A D BUMPER POST AND CONTROLLERS AS TO WHICH PRODUCT THEY SERVE. GREEN CONTROLLER LIGHTS ARE TO GO CUT WJIEN TURBINES ARE OFF OR LOSE POWER, CIVIL ENGINEERING, LAND PLANNING, <br /> SLA (TY < (TYP,S6 INJ, H <br /> ) PER 1 8L LADING HOSE 0 <br /> P. 8 P U DIN Y HAVING JURISDICTION INSTALL 3" FIBERGLASS STAGE 11 VAPOR RECOVERY HEADER FOR VAPOR RECOVERY SYSTEM. SURVEYING, ENVIRONMENTAL SERMCES <br /> IF REQUIRED BY LOCAL AUTHORIT <br /> iD Q MPD) �� <br /> 3 1-0 SLOPE 1/8" PER FOOT MINIMUM TO TANKS. INSTALL 3" TO 2" REDUCING 'TEES WHERE HEADERS BRANCH TO DISPENSERS, CONTRACTOR TO INSTALL <br /> w TRACER TAPE WITH VAPOR PIPING, -TESTING OF VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL., PRIOR TO PAVING AND BEFORE STATION NO. DATE REVISION DESCRIPTION <br /> TION. SECONDARY CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION ONLY, SEE DETAILS AND SCOPE OF WORK ON SHEETS <br /> OPERA <br /> 2" INSIDE 3"E 02/25/16 PLM RLWw ommis <br /> G,0.2.1 & G�0,2.2 FOR PIPE SIZING AT UNDERGROUND STORAGE TANKS, _7Y <br /> FIBERGLASS9 <br /> PRODUCT PIPING <br /> 4 L z C-7 <br /> .4 q <br /> INSTALL 2- INSIDE 3" DOUBLE WALL FIBERGLASS GASOLINE SUPPLY LINES TO DISPENSERS, PIPING SHALL BE INSTALLED PER MANUFACTURER'S <br /> "] 10/4/16 AGENCY/OWNERRM <br /> I SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTAL-LED WITH A MINIMUM SLOPE OF 1/8- PER FOOT FROM THE FUR11-iEST DISPENSER SUMP DOWN A <br /> r7-), w TO THE TURBINE SUMPS. CONTRACTOR TO INSTALL 'TRACER TAPE WITH PRODUCT PIPING, TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO <br /> 4 A 4 ------1=41;-- BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. Z3_\ 10/27/16 AGENCY REVS <br /> 2" 1 91DE 3' <br /> f FIB-RGLASS <br /> 4 ®4 (J- ) <br /> PR DUCT PIPING C8 INSTALL "VEEDER ROOT" -TANK AND LINE ALARM CONTROL PANEL MODEL # TLS-350( IN BUILDING AT NORMALLY OCCUPIED LOCATION IN BUILDING, <br /> AL <br /> 2" STAGE ja ---------------- <br /> VAPOR 1T 1 11 <br /> _ECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION, <br /> SEE ARCHII <br /> 2' TAGS 11 A\ <br /> ° 11OR <br /> 2 T MINIMUM) -10 TANKS AS SHOWN, <br /> 6 <br /> (:97 <br /> z INSTALL A SINGLE 2" FRP VENT LINE FOR EACH UNDERGROUND STORAGE TANK, SLOPE 1/4" PER FOOT (1/8" PER FOO <br /> CONTRACTOR TO INSTALL TRACER TAPE WITI-1 VEN r PIPING. SECONDARY CONTAINMENT TO BE INSTALLED MEN REQUIRED BY LOCAL JURISDICTION ONLY <br /> A <br /> _j THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS. INSTALL, TWO (2) SPARE <br /> 7 <br /> 4 -A. <br /> (,LO TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE <br /> 1- CONDUITS W1 PULL, ROPE FROM GASOLINE VENT RISER TO BUILDING FOR FUTURE TANKDIAGNOSTIC REQUIREMENTS, VERIFY LOCAL REGULA_f1ONS <br /> 4 FOR ADDITIONAL EQUIPMENT OR INSTALLATION REQUIREMENTS, <br /> & <br /> Aq- <br /> 4 14 n pC-1 D1 INSTALL A SINGLE 1" RIGID GALVANIZED CONDUIT FOR EACH NEWLY INSTALLED TURBINE PUMP. <br /> OIL/WA ER SEPA A <br /> �4 4 RAT R <br /> 11 <br /> J? INSTALL DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS. SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER <br /> 3' STAGE 11 86 <br /> i§ 4 <br /> 4 4 4 AND SUMPS. 11 <br /> DOUBLE WALL, FIBERGLASS 19 / , <br /> w <br /> UNDERGROUND STORAGE TANKS D3 INSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES FOR VENT, STAGE I AND STAGE 11 VAPOR RECOVERY AT FILL SIDE SUMP, VERIFY MITI LOCAL L2 <br /> JURISDICTION FOR ALTERNATE REQUIRED LOCATIONS, A <br /> 24' CAI 'H BASIN <br /> A-L <br /> SEAL: <br /> FILL(:jf5 3 xz" Z_z✓ IED GRATE <br /> QA) INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT FILL SUMPS AS SHOWN,W1 SL <br /> YEL GAUGE��j 8.) <br /> TANK LE 4 <br /> 24' CATCH BASIN <br /> Cl D TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AT FILL, MANHOLES, <br /> X <br /> D <br /> _W <br /> SON LID <br /> A� _ USED <br /> CID <br /> S, _y_J I <br /> 9 2- IN E 3* FIBERGLASc CHRIS M. TEB��bf__ <br /> TANK PAD (,-D <br /> 4 TSP Ca <br /> C8314) <br /> TIMM-1 _LAR%STRO@'E ' , l�, , 4 INSTALL WAYNE OVATION SERIES, SINGLE HOSE PER SIDE, MULTI-PRODUCT DISPENSERS AS SHOWN, DISPENSERS TO BE FITTED WITH STAGE 11 HOSES, <br /> NO I <br /> TURBINEC;,,,11 NOZZLES AND BREAKAWAY VALVES PER LOCAL REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR INSTALLING HOSES, NOZZLES AND BREAKAWAYS, <br /> AC NOWLEDGE S TCH <br /> 777"- CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS, START UP BY MANUFACTURER <br /> REGULAR f i _ - >: INSTALL UNDER DISPENSER <br /> TANK LEVEL GAUGE LINLEADE 20 4" CATCH BASIN A REPRESENTATIVE GENERAL CONTRACTOR TO PURGE LINES WITTA A MINIMUM OF 200 GALLONS THROUGH EACH HOSE NOZZLE. ANY AIR POCKETS OR <br /> F ,rIN IL W1 SLOTTED GRAT 4 START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE <br /> STA Ill �p <br /> GROUND VENT, STAGE I & STAGE 11 EMERGENCY ,,----N 'W ASP ALT' CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS TO REPLACE 1T­IE FACTORY <br /> SHUTOFF SWITCH PAVING, TYP, c I v II <br /> ROD VAPOR RE HYDROSTATIC C12- 1 /111 � wr <br /> "":5 - AND MEATIER INSTALLED GASOLINE FILTERS WITH NEW FILTERS, <br /> PROOF OU 'LET CAI, <br /> MONITOR 'TURBINE (T I <br /> 24 ATCH BAS R] <br /> A� \W/ -' C VEEDER-ROOT CARBON CAM,97FE PER FIRE ODE CL8) INSTALL VEEDER-ROOT CARBON CANISTER VAPOR POLISHER ON 2" VENT RISER PIPE <br /> _13 SLOTTED,GRrv, <br /> o <br /> 68 REQUIREME NTS <br /> V :,.9bLISHER <br /> 1 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS, <br /> (2) 2" DIA. ALV. STEEL <br /> VELA f C2�q) INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN I OCATION SHOWN, ALARM AND SWITCH TO BE LOCATED <br /> RISERS WRAPPED GRADE, PA TO PROVIDE AN UNOBSTRUCTED MEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE. SEE WRING DIAGRAM AND DETAIL FOR <br /> 3: <br /> -_7 7 1 4 MOUNTING REQUIREMENTS, <br /> -TO MATCH SITE CONDITIONS R J TE <br /> �2 SPAR 1 CONDU S TO > <br /> IN PINS Y SAFE E AY <br /> 4 <br /> 4, n4 4 FINAL FACILITY EQUIPMENT LOCATIONS TO BE APPROVED BY DISTRIBUTION TERMINAL MANAGER PRIOR TO SUBMITTAL FOR PERMITS 'TO ENSURE CLEAR <br /> 4 4� AND SAFE ACCESS "TO THE UNDERGROUND 'TANKS FOR UNLOADING OPERATIONS, <br /> I3FP <br /> EMERGENCY PUMP <br /> sHu"r-OFF SWITCH AND <br /> N <br /> TD <br /> SET SWITCH(INDOOOR)OR <br /> GENERAL COMPLIANCE NOTES DEVELOPMENTDEVELOPMENTWORMATION, <br /> ;po OU <br /> ARCHITECTIJRAL AND CIVIL DRAWINGS SHALL 'TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, ARCO N11 <br /> 4. -d Oil -------------------------­­.................... <br /> ELEVATIONS AND EQUIPMENT LOCATIONS <br /> 4 <br /> 2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY 3000 am/pm <br /> DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH <br /> VFEDER ALARM MO[ROOITa T THE WORK. <br /> E <br /> FUL CANOPY <br /> SYSTEM <br /> ' <br /> GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" <br /> W/ 6 MPDs <br /> OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND, <br /> -- --------- <br /> 4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK <br /> OPERATIONS. <br /> SITE'WEESS: <br /> 5� ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL <br /> CODES AND GOVERNING AUTHORITIES. <br /> ESCALON AVE-ME <br /> 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE Willi THE PRODUCT STORED. <br /> FIGMAY 20 <br /> 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. <br /> 8� GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR 1-0 TANK ESCALOR CA <br /> O INSTALLATION, ­ ........ <br /> 9. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S TI­iIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4) FACILI rY # TBD <br /> CONSTRUCTION PHASES (SEE SPECIFICATIONS): <br /> TING IN HOLE AND SOAP TEST, <br /> A, TANK AIR [EST BEFORE SET <br /> SEPARATECONSI <br /> DESIGNED BY�. ALLIANCE Z&DM: <br /> B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTIED FOR 30 MINUTES. AL <br /> C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH <br /> UIECKED BY: BP REM <br /> MANUFACTURER'S GUIDELINES. OV <br /> D. FINAL INSPECTION INCLUDING ALL PORTIONS OF' ITIE LEAK DETECTION SYSTEM, DRAW BY: ALLIANCE PW <br /> mm10. ALL "TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) MITI WAt <br /> R, M V� PROJECT NO; <br /> ------- 0 10 20 40 STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE 1 <br /> THAT' THE SUMPS ARE WATERTIGHT. _ 20 <br /> RECORD THE TEST RESULTS AND SUBMIT TO OWNER, 12/14/265 17223 <br /> 11, TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING <br /> AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION, DRAWING ITTLE <br /> 1 =20' 12, PRIOR "TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL, AND MONITORING ANNULAR SPACES OF TANK UNDERGROUND TANK AND PIPING <br /> AND DISPENSER SUMPS, SITE PLAN <br /> 13, PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION <br /> WITHIN 30 DAYS OF -THE FINAL INSPECTION. AND INSTALLATION NOTES <br /> 14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY BP). <br /> WE <br /> NCS.\ UNDERGROUND TANK AND PIPING SITE PLAN 15. MEASUREMENTS OF BRINE LEVELS IN TANKS SHALL BE TAKEN BY BP REPRESENTATIVE DURING THREE SEPARATE VISITS 10 SITE' SHEET <br /> AND PRIOR mrO FUELING OPERATIONS, REFER TO TANK MANUFACTURER'S INSTAIJ_ATION INSTRUCTIONS FOR REQUIREMENTS, <br /> GmOm2mO <br />