My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
INSTALL_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2023 4:32:34 PM
Creation date
11/8/2018 10:25:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2017
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\ESCALON\1329\PR0231487\2017 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Time In: <br /> Time Out: <br /> �oA , fo San Joaquin County <br /> ` Environmental Health Department <br /> fel: x <br /> -. 1868 East Hazelton Avenue , Stockton , CA95205-6232 <br /> to* NN <br /> I . . , = p Telephone: (209) 468-3420 Fax: (209) 464-0138 Web: www. s ' qov. org/ehd <br /> Storage Tank Program Service Request Inspection Report <br /> Name of Facility: ARCO AM PM Date : 05/18/2017 <br /> Address : 1329 ESCALON AVE , ESCALON 95320 <br /> Requestor : PAUL RAJ , CHADHA CONSTRUCTION Telephone: (209 ) 595-0787 <br /> Program Element : 2303 - UST/PIPING INSTALLATION Request # : SR0074800 <br /> Inspection Type: 131 - UST INSTALLATION INSPECTION <br /> Onsite Service Technician Engel Molina ( Installer) ICC Service Tech/Installer Exp , Date : 02/08/2018 <br /> Manufacturer training : <br /> OVERALL INSPECTION NOTES AND COMMENTS <br /> NOTES <br /> On site for the following inspections : <br /> -Witnessed 1 hour primary piping pressure test of the 87-product piping , 91 -product piping , 87-vent piping , 91 -vent piping , and <br /> vapor recovery piping . All passed . <br /> -Witnessed primary soap test of all piping and penetrations ( product and vent) . All passed . <br /> -Compared piping placing to the site map submitted in the approved plans . Vapor recovery piping has not been installed in the <br /> location indicated in the plans . As-built plans will be required . <br /> * "Additional inspections are needed . See the permit approval letter dated December 15 , 2016 for a complete list of <br /> inspections required . All appointments must be scheduled 48 hours in advance . <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code. If a reinspection is required , fees will be assessed at the current hourly rate. <br /> Received by: Name and Title: <br /> EH Specialist : STACY RIVERA Phone : (209 ) 468 -3440 <br /> FA0000293 SR0074800 SC131 05/18/2017 <br /> EHD 23-01 Rev, 06/30/15 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.