Laserfiche WebLink
A2 <br /> cLrENTe <br /> f WORKsbp <br /> 1 1 nTAL <br /> PIPE F AN F1T1lN a �. .-� E NP1C)L,E�`GRO NS: � % �` �. !� - -" _ - ` _ ...... <br /> 1w <br /> AL._L_ 1t7 NH0)1_.T�. O ENIING CSN iFT1E TAN�T aL..AE ahTAIT T I TALE_ D WITEi A 1 CSWN (T RIS C V 1 2 RU�f� CF- <br /> ­11-2 <br /> STANDARD: STEEL PIPE SHOWN ON 'THESE DRAWINGS TO BE MINIMUM SCHEDULE 40, METAL. PRODUCT UNE FITTINGS TO BE MALLEABLE IRON CLASS CONCRETE_ TO PREVENT WATER INTRUSION IN'T'O THE MANHOLE:. THE OWNER'S ENGINEER, THE BP PROJECT MANAGER WILL BE CONTRACTOR PERFORMANCE: <br /> 150, GALVANIZED. ALL MALLEABLE IRON FITTINGS SHALL, BE SUPPLIED BY "ANVIL" FORMALLY "GRINNE:LL" OR EQUAL SPECIFICATIONS AS FOLLOWS: REQUIRED TO SIGN OFF ON THIS ITEM ON THE TANK INSTALLATION CHECKLIST', - UNDER IS CONTRACTOR FOR A PERIOD OF TWO <br /> THE. CONTRACTOR WILL GUARANTEE ALL MATERIAL-S AND WORKMANSHIP FURNISHED BY HIM Tia � <br /> DIMENSIONS MATERIAL. GALVANIZING THREAD PRESSURE RATING YEARS FROM THE DATE. OF FINAL ACCEPTANCE OF THE: WORK OF THIS CONTRACT BY THE OWNER AND THE ENGINEER AND PROVIDE A BOND TO <br /> M.I. FITTINGS ..._ _.__.____....___ _._.___._..__..___ ___._..___._._....__..__ __..__.___._.___._____ �_..._._ _.._....___.______...__.._ <br /> PRODUCT IDENTIFICATION MARKINGS: VALIDATE THIS GUARANTEE. ANY DEFECTS DEVELOPING WITHIN TETE PERIOD 'TRACEABLE TO MATERIALS OR WORKMANSHIP PERFORMED HERE UNDER, <br /> TEES, ELBOWS) CONTRACTOR 'TO INSTALL PRODUCT IDENTIFICATION TAGS AT ALL MANI-101_E. OPENING PER SITE SPECIFIC DETAIL DRAWINGS, WILL BE MADE GOOD AT THE EXPENSE OF THE CONTRACTOR NOT THE OWNER OR ENGINEER, THE CONTRACTOR WILL, ACCEPT AND FULLY <br /> _ �. <br /> GLASS 150/PN 20 AM 816.3 ASTM A--197 ASTM A--15;3 ASME E3.1 201AME ET1 G.� UNDERSTAND THIS PROVISION PRIOR TO CONTRACT EYEING AWARDED, AS NO CLAIM FOR EXTRA COMPENSATION WILL BE ALLOWED FOR CORRECTION <br /> OF FAULTY WORK OR DEFECTIVE: MATERIALS. ANYTIME DURING HE CONSTRUCTION PERIOD, THE OWNERS REPRESENTATIVES AND THE ENGINEER <br /> M.I. UNIONS RETAIN THE RIGHT r0 REQUIRE THE CONTRACTOR TO REMOVE AND REINSTALL ANY EQUIPMENT OR MATERIALS NOT FOLLOWING -THE STANDARDS AS - <br /> CLASS 150/PN 20 ASME 816.39 ASTM A---19'7 ASTM A-_153 ASME B,1 20.1 ASME 816,3 CALIFORNIA: CONTRACTOR TO THICKEN CONCRETE SLAB AT DISPENSER SUMPS AND TANK FILL AND TURBINE SUMPS SUCH THAT HEREIN R N TH DRAWINGS WITHOUT COST TO THE OWNER OR ENGINEER. <br /> ,, S THE BOTTOM OF CONCRETE IS BELOW THE TOP OF THE TERMINATION OF THE SECONDARY CONTAINMENT' OF THE SUMPS PER <br /> PRESENTED O O E C) O <br /> STEEL PIPE E� NII F LEa <br /> CLASS 150/PN 20 ASTM A733 ASTM A­53 ASTM A.-153 ASME B.1 20.1 ASME 816.3 AB--2481 REQUIREMENTS. CONTRACTOR WILL PROVIDE PROOF OF PERFORMANCE BOND WITH SHOP DRAWINGS <br /> (F 0R E) 1 F_` IINC.7, <br /> STEEL_ PIPE __._._.� . PROVIDE 3 SETS OF SHOP DRAWINGS � .,SAMPLES FOR ALL EQUIPMENT, PRIOR TO ORDERING AND IN A TIMELY' MANNER (AS DETERMINED BY THE <br /> CLASS 150/PN 0 N/A ASTM A- 53 ASFM A-153 ASME B.1 20.1 ASME 816.3 CONTRACTOR SHALL. COMPLETE:: ALC_ TESTING ACCORDING TO MANUFACTURER"S INSTRUCTIONS FOR TANKS AND PIPING AND PER INDUSTRY ENGINEER) SO NOT TO DELAY WORK, TO THE ENGINEER FOR APPROVAL.. (CONDUIT, SWITCHES" CONDUCTORS, ECT,) WHERE SUBSTITUTIONS ARE <br /> SCHEDULE 40 (F OR E) RECOMMENDED PRACTICES (API & PEI). CONTRACTOR SHALL COMPLETE ALL WARRANTY VALIDATION TESTING AND PROVIDE DOCUMENTATION TO MADE, CONTRACTOR WILL INCLUDE COMPARISON DATA & SAMPLES FOR BOTH THE SUBSTITUTE: AND SPECIFIED ITEMS FOR REFERENCE PURPOSES. <br /> GASOLINE/ALCOHOL COMPATIBLE THREAD SEALANT TO BE USED ON ALL THREADED PIPE CONNECTIONS. OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT MANAGER, pr <br /> ANY METAL PIPE OR FITTING USED FOR PRODUC1m VENT" OR VAPOR RECOVERY WHICH CONTACTS SOIL OR BACK FII.J_ MUST BE 100; COVERED WITHEE JTENS CONTRACTOR WILL PROVIDE. LETTER TO ENGINEER CONFIRMING ALL, EQUIPMENT AND TERMINATIONS ARE PROPERLY TORQUED - SIGNED BY <br /> A 100 MIL. COATING OF GOAL. TAR EPDXY (ROSS COAT OR 3M SCOTCH WRAP #50 TAPE:). ISOLATE Tl--E PRODUCT TANKS AND DISPENSERS DURING PRESSURE TESTING OF LINES IN ORDER TO PREVENT DAMAGE. LICENSED CONTRACTOR. <br /> THE DESIGN, ASSEMBLY, AND TESTING OF THE. PIPING SYSTEM SHALL_ BE IN CONFORMANCE. WITH "THE APPLICABLE. SECTION CONTRACTOR WILL. PROVIDE ACCURATE AND COMPLETE "AS BUILT" DRAWINGS TO OWNER AND ENGINEER AT TIME OF OWNER ACCEPTANCE. ALL ARCO <br /> : OF ANSI--B31 , AMERICAN NATIONAL STANDARD CODE FOR PRESSURE PIPING, NFPA 30, FLAMMABLE AND COMBUSTIBLE ""AS BUILT"" DRAWINGS -TO BE 4 SETS OF' "BLUELINES"" OR PHOTO) COPY PRINTS 24"" X 36"" AND TWO SETS (OWNER/ENGINEER) ON MAGNETIC <br /> 1 f iw� I ( SUMP PENETRATION INSTALLATION: LIQUIDS CODE, AND AMERICAN PETROLEUM INSTITUTES RECOMMENDED PRACTICE 1615. MEDIA & AUTOCAD 2010 (BY AUTODESK) COMPATIBLE. FAILURE ..r0 DO SO WILL CONSTITUTE FORFEITURE OF ALL PAYMENTS DUE AND HOURLY OP WWT <br /> STANDARD: CONTRACTOR -TO INSTALL SUMP PENETRATION FITTINGS. ALL PENETRATIONS OF THE SUMPS TO BE ON A LINE TOWARD THE CENTER OF DURING CONSTRUCTION, BEFORE BACK FILLING, PIPING SHOULD BE ISOLATED FROM -E TANKS AND SUBJECTED -TO A PIPE TIGHTNESSTEST, RATES OR $99,00/HOUR/MAN MINIMUM TO ENGINEER PAI ) BY CONTRACTOR FOR "AS BUILT° DEVELOPMENT. <br /> THE SUMP, NOT TO EXCEED MANUFACTURERS RECOMMENDED ANGLE IN ANY DIRECTION, -TO ENSURE TF-IE PROPER INSTALLATION OF ALL BULKHEAD OTHER TESTING METHODS MAY ALSO BE ACCEPTABLE. IF APPROVED BY 'THE AUTHORITY HAVING JURISDICTION. A CONSTRUCTION PIPE TEST IS <br /> AND COMPRESSION FITTINGS AND RESULTANT WATER TIGHTNESS. ALL PIPING„ CONDUIT AND GROUNDS THAT PENS-TRATE THE SUMP SIDE WALLS MIDST CONDUCTED AS FOLLOWS: <br /> BE SEALED WITH DOUBLE SIDED BULKHEAD FITTINGS IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY TESTED WITH STANDING WATER FOR A PERIOD <br /> OF 24 HOURS OR CERTIFIED USING SUMP MANUFACTURERS APPROVED TESTING PROCEDURE TO INSURE THAs SUMPS ARE WATERTIGHT, THE OWNER'S A. THE PRODUCT' PIPING TO BE TESTED IS ISOLATED AND PRESSURIZED WITH COMPRESSED AIR TO 150 PERCENT OF THE MAXIMUM SYSTEM <br /> ENGINEER, -THE BP PROJECT MANAGER MUST SIGN OFF ON THIS TESTING ON THE TANK INSTALLATION CHECK LIST, OPERATING PRESSURE (OR A MINIMUM OF 50 POUNDS PER SQUARE INCH GAUGE; MAXIMUM AS RECOMMENDED BY COMPONENT MANUFACTURER) <br /> FOR AT LEAST 30 MINL,ITE.S AND NOT MORE: THAN 1 HOUR.. <br /> MANUFACTURER ENTRY BOOT TYPE VARIANT: THE MAKE AND MODEL_ NUMBERS OF THE PIPING PENETRATION FITTINGS SHOWN IN -'TILE DETAILS ARE <br /> B. ALL PIPING SURFACES INCLUDING VAE...VES, FITTINGS, 4101NT'S, AND SO FORTH ARE. WETTED WITH A SOAP SOLUTION AND INSPECTED FOES NOT SUBJECT TO CHANGE:. N.O.V. FRP BONDED ENTRY FITTINGS ARE REQUIRED FOR ALL PIPING PENETRATIONS, CONDUIT PENETRATIONS INTO SUMPS BUBBLES. <br /> SHALL BE AS SPECIFIED ON THE PLANS, C. LEAKS, AS INDICATED BY BUBBLES, ARE REPAIRED OR REPLACED, AND THE PIPING RE-TESTED AS NECESSARY. 0e <br /> D, ThiE INNER PIPE WALLS SHALL BE TESTED FOR TIGHTNESS BEFORE CLOSING THE OUTER PIPE. 'THE OUTER PIPE MUST BE TESTED AT A 5 <br /> _ �, MEET , _ _ _. POUNDS PER SQUARE INCH GAUGE MAXIMUM BEFORE BACKFILLING, CARE SHOULD BE TAKEN TO PREVENT OVER PRESSURIZATION OF THE ` ° <br /> CALIFORNIA: CONTRACTOR TO INSTALL .SUMP PENETRATION FITTINGS THAT MEE.:T THE ADDITIONAL., CRITERIA REQUIREMENT FOR CONTINUOUS <br /> INTERSTICE. IT IS IMPORTANT THAT TFIE MANUFACTURERS INSTRUCTIONS BE FOLLOWED. REPEAT BOTH TESTS AFTER BACKFILLING. <br /> HYDROSTATIC AND VACUUM MONITORING. Z <br /> WHEN THE PIPING IS INSTALLED AND OPERATIONAL, A HYDROSTATIC TEST OF THE PIPING, AS SPECIFIED IN NEPA 329, MAY BE REQUIRED BY IN WNk <br /> CODES. <br /> 1�_C I S NI S � INSTALLATION: <br /> STANDARD: CONTRACTOR TO INSTALL, "WAYNE OVATION" STYLE DISPENSERS WITH INTEGRATED CARD READERS AND INTERCOM SYSTEM AS SHOWN ON CAUTION: EXTREME CARE SHOULD BE EXERCISED IN CONDUCTING PIPE TIGHTNESS TEST,, PRESSURIZED PIPING IS POTENTIALLY DANGEROUS 18215 72ND AVENUE SOUTH <br /> SITE SPECIFIC DESIGN DETAIL SHEETS. DISPENSERS TO BE INSTALLED PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALLATION TO INCLUDE BECAUSE OF THE POSSIBILITY OF' VIOLENT RUPTURE. THIS TEST SHOULD BE: CONDUCTED WITH MINIMUM EXPOSURE OF PERSONNEL._ AND WITHOUT KENT, WA 98032. <br /> DISPENSER ISLANDS, SINGLE WALL. DISPENSER CONTAINMENT SUMPS„ AND THE INSTALLATION OF ALL SHEAR VALVES„ RISER,, PIPING CONNECTIONS MOVING OR DISTURBING THE PIPING BEING TESTED. WHEN THE 'TEST IS COMPLETED, THE PIPING PRESSURE: CAN BE REDUCED OR RELEASED (425)251-0222 <br /> AND ALL.. PENETRATIONS INTO THE SUMPS, SEE:. TANK ELECTRICAL DRAWINGS FOR CONDUIT AND WIRING REQUIREMENTS, COMPLETELY FOR THE'. REMAINDER OF CONSTRUCTION. REFER TO TT"IE:. PIPING MANUFACTURER'S RECOMMENDATIONS, (425)2.51-8782 FAX <br /> DISPENSER START LDP: - START UP BY MANUFACTURERS REPRESENTATIVE. CONTRACTOR 'TO PURGE LINES WITH 2001 GALLONS PER HOSE MINIMUM. N.O.V. PIPING SHALL BE TESTED ACCORDING 'TO MANUFACTURER'S SPECIFICATIONS. CIVIL ENGINEERING, LAND PLANNING, <br /> ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL.. BE BILLED VAPOR RECOVER PIPING MUST PASS ALL GARB BL._OCKAGE, TESTING RELATIVE TO TIGHTNESS, PRESSURE DECAY, & BLOCKAGE RATES. A/L_ -TESTING SURVEYING, ENVIRONMENTAL SERVICES <br /> BACK TO THE CONTRACTOR IS REQUIRED FOR "ASSISTED" STAGE 11 SYSTEMS (IF INSTALLED). NOTIFY THE. BP PROJECT MANAGER TO C00RDINATE, -� --- - --_-� <br /> NODATE IREMSION DESCRIPTION <br /> CONTAINMENT SUMP TESTING: _21-E-02/25/16 RLW Coom <br /> ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT' SUMP='S SHALL. BE HYDROSTATICALLY TESTED (LAKE TEST) WITH STANDING WATER <br /> ABOVE THE LEVEL OF. THE HIGHEST PIPE OR CONDUIT PENETRATION FOR A PERIOD OF 24 HOURS AFTER ALL WORK IS COMPLETED TO I0/4/16 AGENCY/OWNER N. <br /> INSURE -THAT THE SUMPS ARE WATERTIGHT OR CERTIFIED USING SUMP MANUFACTURER'S APPROVED TEST PROCEDURE TO INSURE THAT __ � --10/27/1-6 <br /> 102716 ENGYREVS- <br /> ARCO <br /> E _ARCO BRANDED: DISPENSERS INSTALLED WITHOUT CARD READERS IN DISPENSERS. CONTRACTOR 10 INSTALL TWO (2) DOUBLE SIDED PAYMENT ISLAND SUMPS ARE WATERTIGHT PER UST REGULATIONS. THE OWNER'S ENGINEER MUST SIGN OFF ON 'THIS TESTING ON THE TANK INSTALLATION <br /> CASHIERS (PIC UNITS) AS SHOWN ON SITE. SPECIFIC PLANS. START UP BY MANUFACTURERS REPRESENTATIVE, START UP PROBLEMS DUE TO CHECKLIST, 11111A117-4 <br /> IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL_ BE BILLED BACK --0 THE CONTRACTOR. REFER TO ARCHITECTURAL. CALIFORNIA : ALL DOUBLE WALL_ SUMPS SHALL BE BRINE FILLED AND INSPECTED FOR TIGHTNESS THROUGHOUT THE INSTALLATION PROCESS <br /> CANOPY DRAWINGS FOR ADDITIONAL.... SITE PREP AND CONDUIT REQUIREMENTS. ONCE SUMPS HAVE BEEN FILLED WITH BRINE SOLUTION, <br /> CALIFORNIA VARIANT: DISPENSER SUMPS 'T'O BE DOUBLE WALL AND INSTALLED WITH CONTINUOUS HYDROSTATIC MONITORING DEVICE. PER AB-2481 <br /> REQUIREMENTS FINAL SYSTEM TESTING: '? .. <br /> AFTER COMPLETE INSTALLATION OF THE ENTIRE FUEL SYSTEM AND ALL PAVING, THE OWNER'S REPRESENTATIVE OR HIS AGENT, THE BP PROJECT <br /> MANAGER, SHALL_ ARRANGE FOR A PRECISION TANK AND LINE TEST TO BE PERFORMED ON THE COMPLETE SYSTEM, SUCCESSFUL COMPLETION OF �� <br /> THIS TEST WILL BE REQUIRED FOR FINAL_ APPROVAL, THIS TEST SHALL ENSURE.: THAT ALL NEW TANK & PIPING SHALL MEET ALL FEDERAL, STATE, <br /> & LOCAL REQUIREMENTS FOR TIGHTNESS INTEGRITY, PRIOR TO START---UP OF SYSTEM, OPERATIONALLY TEST ALL. OTHER EQUIPMENT' INCLUDING <br /> IMPACT (SHEAR) VALVES, LINK LEAK DETECTORS, LEAK DETECTOR ALARMS, ANP:.) EMERGENCY SHUTDOWN SWITCHES IN ACCORDANCE WITH THE ° <br /> ------------- <br /> MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE (3) COPIES OF ALL CERTIFICATIONS & TEST- RESULTS TO OWNER'S REPRESENTATIVE Al <br /> OR HIS AGENT, THE BP PROJECT MANAGER. <br /> 12_ <br /> TANK SYSTEM 'TEST METHOD CALIFORNIA ONLY AB-2.481: SEAL: <br /> CALIFORNIA CONTRACTOR TO INSTALL ORVR PHASE II EVR COMPATIBLE HOSES NOZZLES, SWIVELS AND BREAK AWAY VALVES PER APPLICABLE - - - - <br /> / � M � BEFORE TIME' UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE IINDERC.TROUND STORAGE TANK SHALL BE TESTED AFTER SSS <br /> GARB EXECUTIVE. ORDER WITH IN SYSTEM DIAGNOSTICS (ISD) PER LOCAL JURISDICTIONAL_ REQUIREMENTS, INSTALLATION USING ONE OF THE: FOLLOWING METHODS TO DEMONSTRATE 'THAT" .THE TANK IS PRODUCT TIGHT: <br /> 1) ENHANCED LEAK DETECTION (ELD) BY TRACER CORPORATION. ,- <br /> 2) AN INERT GAS PRESSURE TESL.. THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND APPROVED BY THE BOARD. '�; <br /> 3 A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE.: BOARD IN CHRIS M. TE,`B <br /> w. <br /> REGULATIONS ADOPTED PURSUANT -TO THE APPL...ICABLE CHAPTER IN THE CODE, AN UNDERGROUND STORAGE: TANK INSTALLED AND TESTES) � �6 <br /> IN ACCORDANCE WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS OF SECTION 25292.5, CPT 1S1'wld <br /> _ TANK ELECTRICAL, ! <br />