Laserfiche WebLink
1;.QIFIED PROGRAM CONSOLIDATED FOS <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN— (Page 2 of 2 <br /> VI. UNDER DISPENSER CONTAINMENT(UDC) MONITORING (Check aim, <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHODS) tear ) <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING X 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49a-5M, <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 4yfl-Hy, <br /> LEAK MONITOR MANUFACTURER:ISWO avo-ss. MODEL p: sw-s6 <br /> LEAK SENSOR MANUFACTURER: wasT. MODEL#(S): +vasa. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a YES X b.NO 40.19. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES X b.NO 49 4 , <br /> FAILUREIDISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES X b.NO 4vo61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. X s.YES ❑ b.NO 490'63 <br /> UDC CONSTRUCTION IS: X I.SINGLE WALL <br /> ❑ 2.DOUBLE WLL <br /> Awoes <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 490 <br /> ❑ a LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a YES ❑ b. NO 49oe4p <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THATNHF ANCFO 49 5 <br /> MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS Ae RE UIRED.luccaliwil <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49pa6 <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49067 <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 499-68 <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS and su <br /> ❑ f.ATG TESTING RESULTS(and supporting ( phoning documentation records) <br /> DCdocumentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Cg Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to dxirjob duties: 4vp.6y, <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 90�Po <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) max <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS +9o-6w <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND 4wew <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 4" <br /> ❑ OTHER(Specify): 4voa9p <br /> This facility has a"Designated UST Operator'who has passed the Califomia UST System a�. <br /> ys Operator Exam administered by the International Code Council <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> > Name(s)of contact persons)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490.71 <br /> TIM ova1611 avY11iM mwTaniem if a OfNJ 81 lupe Mat uplizee a fl valva 10 venl meefilla. TM valve is set x195%of MIMn a tract elpesa. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operuor is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintcim=of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release arc investigated;and 3.)all monitoring records arc maintained Proper <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Guillermo Lopez 49 n TITLE:Manager 490.11 <br /> NAME: Sandy Edwards 490.74 TITLE:Environmental Compliance Admin. 496 75 <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions thin need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:1 certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 49an. <br /> 4/28/2011 <br /> i REPRESEm1Nn X l TW Owie 2 Fttil Owiv/ a J ArapdizW R iM of Oxnc 490.76 <br /> UPCFUST-D(12R007)-4/8 wwtr.uaidou.org <br />