My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
11/8/2018 10:26:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0505356
PE
2361
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
18662 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\18662\PR0505356\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
2/1/2018 6:57:52 PM
QuestysRecordID
3778978
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: D Sump Manufacturer D Industry Standard X Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure D Vacuum X Hydrostatic <br /> D Other(Spec) <br /> Test Equipment Used: Caldwell Level Chane Indicator Equipment Resolution: .002 <br /> Sump#1-87 Sump#2-89 Sump#3-91 Sump#4-Diesel <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 40" 40" 40" 40" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 11" 11" 10" 18" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 12" 8" 14" 14" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' Water Level 28" Water Level 29 %d' Water Level 29" Water Level 29" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes Yes <br /> shutdown?* <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 9:47 9:42 8:57 8:52 <br /> Initial Reading(Ri): .001 .001 .001 .001 <br /> Test End Time: 10:17 10:12 9:27 9:22 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? <br /> Yes Yes Yes Yes <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"DIA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.