Laserfiche WebLink
0 <br /> F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ID® Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground taut <br /> ® Yes El No* Were all tank gauging probes visually inspected for damage and residue buildup? ,. <br /> ® Yes ❑ No' Was accuracy of system product level readings tested? APR " 0 201 <br /> ® Yes ❑ No' Was accuracy of system water level readings tested? <br /> ® Yes ❑ No' Were all probes reinstalled property? <br /> ® Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? ENVIREAMENTAL EALTH <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. E)EPA , <br /> Line Leak Detectors(LLD): ❑ Check this box N LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs oonfirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus property calibrated? <br /> ® Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled ordisconnected? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions orfails a test? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDS,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will he corrected. <br /> H. Comments: <br /> ALL 4 LDS PASSED <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />