My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18662
>
2300 - Underground Storage Tank Program
>
PR0505356
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
11/8/2018 10:26:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0505356
PE
2361
FACILITY_ID
FA0006733
FACILITY_NAME
GEORGES BP MINI MART
STREET_NUMBER
18662
Direction
N
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
CURRENT_STATUS
01
SITE_LOCATION
18662 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\E\HWY 88\18662\PR0505356\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
2/1/2018 6:57:52 PM
QuestysRecordID
3778978
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> RECE V: D <br /> UST SYSTEM RETROFIT OR REPAIR MAR28 2017 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained b EHD) <br /> EPRONMENTAL HEALTH <br /> 1. Site map enclosed? YES[I NO[] DEPARTMFNT <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Found L$alar(Diesel STP sump)205 sensor had damaged wires displaying sensor out alarm, <br /> removed and replaced with new 208 sensor. <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> VR 798340-208 Liquid Sump Sensor <br /> EH230038(revised 12-11-15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.