Laserfiche WebLink
p.1 <br />SAI' JOW,II COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />TTNJ"VownnlVn CTl11Q A(`_F TANK <br />MONITORING PLAN — PAGE I <br />TYPE OF ACTION ❑ L NEW PLAN ❑ 2. CHANGFr OF INFORMATION <br />PLAN 'TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />Mat• <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. _FACILITY INFOR11LMON <br />FACILITY ID # (Agency Use Orly) <br />G <br />FACILITY NAME '4)(; C f Ck-:tN 7(:►2 14Ae-C • '4C <br />Mos, <br />FACILPIY SITE ADDRESS <br />CITY S 7c��7C) �1s/lvtos. <br />IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />State law requires ti -.at zesting, preventive maintenance, and calibration of monitoring equipment (e,g., sensors, probes, fine leak detectors, etc.) be performed in <br />Mob. <br />accordance with the equipment manufacturers' instructions, or annualiv, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORINGEQUIPMENT IS SERVICED %L -I . ANNUALLY ❑ 99, OTHER (Specify): <br />Mor' <br />- IL 1wI(}NITORING:LOCATi4lS <br />This monitoring plan must include a Site Plan showirtg the general tank and piping layouts and the locations where monitoring is performed (i.e, location ofeach sensor, <br />line leak detector, monitoring system control panel, etc.). If you already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />farm Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this plan. <br />IV: TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOWING MEITIOD(S): (Check all that apply) <br />1 CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACES) OR SECONDARY CONTAINMENT VAULTS-, <br />SECONDARY CONTAINMENT 1S: LZ a. DRY ❑ b. LIQUID FILLED UNDER PRESSURE_ ❑ d- UNDER VACUUM <br />Mit• <br />PANEL MANUFACTURER: TAIM-41 M72' MODEL#: IS'` 10067–LU <br />Mls. <br />LEAK SENSOR A4ANUFACTURER,±Cynr ___ __-_ M14' MODEL#(S):%Sp•/S �7,iiy�.7i•r� <br />a+�s <br />t2 2, AUTOMATIC TANK GAUGING (ATG USED TO MONITOR SINGLE WALL TANK(S) <br />PANEL MANUFACTURER: tir r btl6. MODEL#: <br />Mlr. <br />bt16• N40DEL#(S): TS 24406'F If <br />IN -TANK PROBE MANUFACTURER: _ <br />M19. <br />_ _ <br />LEAK TEST FREQUENCY: a CONTINUOUS El b. DAILY/NIGHTLY ❑ c. WEEKLY <br />M'D <br />❑ d. MONTHLY ❑ e OTHER (Specify): M`t• <br />PROGRAMMED TESTS: ❑ a D. I g.p.h. ❑ b. 0.2 &0L ❑ c. OTHER (Specify): K <br />M21. <br />'0'3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR fi2646.1 <br />11124. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS [Ib. 60 HOURS <br />s' <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />Mze. <br />Mr. <br />TEST FREQUENCY: .. a ANNUALLY [Ib. BIENNIALLY C] c- OTHER (Specify): <br />❑ 6 -VISUAL MONITORING DONE: r ,a. DAILY ❑ b. WEEKLY (ttequiresasenryopprovaq <br />M26 <br />❑ 99. OTHER (specify): <br />V. PIPE MONITORING <br />.mONrTORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />nlo. <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMPS),1TRENCH(ES) .0.ND OTHER SECONDARY CONTAINMENT <br />M;l• <br />SECONDARY CONTAINMENT IS: a. DRY [Ib, LIQUID FILLED a UNDER PRESSURE ❑ d- UNDERpVACUUM <br />1ri2' —1000 <br />PANEL MANUFACTURER: IAC©/V MODEL #: <br />LEAK SENSOR MANUFACTURER.- r,A{a 4/ -M34 - MODEL #(S): oo — I <br />n21s. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? � a YES ❑ b. NO <br />M%' <br />WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHLTDOWN? X a YES ❑ b. NO <br />1-07- <br />2. MECHAN[CAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORIMS. 3.0 p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTEDjj <br />Ir E� -J'qCt.C'_ % "0s' MODEL #(S): Lr L D <br />M39 <br />MLLD MANUFACTURER(s): <br />❑ 3 ELEC-IRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 gp.h. LEAK TESTS <br />ELLD MANUFACT J RER: x'140. MODEL #: <br />MAL <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M4` <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN' ❑ a YES ❑ b. NO <br />tvlas. <br />WILL ELLD FAILURE/DISCONNECUON TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b- NO <br />M°4• <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ❑ a ANNUALLY b EVERY 3 YEARS [7c. OTHER (Specify) .1145. <br />M46 <br />❑ S -VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY4 ❑ c. MIN. MO\'MLY & EACH TDAE SYSTEM OPERATED'* <br />• Regoirn ncnc=' Wpravel "Allowed forwomiming of mMried einorgency gaermorfoet pipingonly per HSC §25231.5(bl(3) <br />tier. <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER23 CCR §2636(a)(3) <br />7- NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99.OT14ER (Specify) <br />M48. <br />SJCEHD-d (07/03) -114 WfiNu3 <br />