My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 2:50:23 PM
Creation date
11/14/2018 4:50:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> �sow°es <br /> STATE OF CALIFORNIA W COs, <br /> STATE WATER RESOURCES CONTROL BOARD , °0 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS— SPECIFY IF UNKNOWN yy <br /> A OWNER'S TANK 1.D.# /fi B. MANUFACTURED BY: ) K�1(1 kj <br /> C. DATE INSTALLED(MOIDAYNEAR) t�19 3) D. TANK CAPACITY IN GALLONS: 1 I ©v <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C 1a REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY PRODUCT ❑ lb PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ <br /> lc MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> �� T <br /> A. TYPE OF I�J ' DOUBLE WALL ❑, 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ d SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL �3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING lt�3 EPDXY UNING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES.i�_-`NO_ <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> E.SPILL AND OVERFILL,etc. <br /> DROP TUBE YES 'f— NO STRIKER PLATE YES / NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A& 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A&2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A pIl 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEELW/COATING A U 8 100% METHANOL COMPATIBLEW/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> 1 MECHANICAL UNE LEAK 2 UNE TIGHTNESS CONTINUOUS INTERSTITIAL 4 ELECTRONIC LINE ❑5 AUTOMATIC PUMP 99 OTHER <br /> D. LEAK DETECTION ❑ DETECTOR TESTING MONITORING ❑ LEAK DETECTOR SHUTDOWN [:] <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 MANUAL RECONCILIATIONMONITORING <br /> ❑ 3 VADMONOITORING ❑ 4 AUTOMATGAUGING IC TANK ❑ 5 GROUND MONITORING TER TEIAL TANK <br /> TES' <br /> ❑ 7 CONTINUOUS <br /> MONITORING INTERSTITIAL ❑ 8 SIR ❑ 9 TANK GA GANGAL ❑ 10 TESTING95TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATfpD E T SED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> ' / SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED S SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# m 0 bll 1 , <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLV�ATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. F^pM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING TN ERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.