My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 2:50:23 PM
Creation date
11/14/2018 4:50:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. FSp�aG�Y <br /> STATE OF CALIFORNIA 1' <br /> STATE WATER RESOURCES CONTROL BOARD <br /> ti) r UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> },•ul COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLO-S O <br /> ONE ITEM ' 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ B TANK REMO}4EC7 <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 9/ <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.z B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAY/YEAR) 7 I D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. v <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C• ❑,{1aUNLEA ED a 4 GASAHOL ❑ 6 AVIATIONGAS <br /> PETROLEUM ❑ BD EMPTY 1 PRODUCT X lb PREMIUM <br /> ❑ 5 JET FUEL ❑ 7 METHANOL <br /> 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S. <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE LL ❑ 3 SINGLE WALL WITH EXTERIOR LINER 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE IAL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B. TANK <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) 9 BRONZE ❑ t0 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> 1 RUBBER LINED 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WI 100% METHANOL? YES_ NO <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 DATING ❑ 3 VINYL WRAP (❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEA OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR F UNDERGROUND.BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSu Ir., A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STkL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U B 100°/ METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PR07EC ON A U 95 UNKNOWN A U 99 OTHER <br /> TIAL <br /> D. LEAK DETECTION E] 1 AUTOMATIC LINE LEAK DETECTOR 2 LINE T GH SS TESTING ❑ 0(MONITORING ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORIN ❑ 4 AUTOMATIC TANK GAUGING a 5 GROUND WATER MONITORING <br /> 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER _ <br /> VI.TANK CLOSURE INFORMATION <br /> [77S <br /> TIMAT D AT�ST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO!— <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED&SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW I�� <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# = = i I I <br /> PERMIT NUMBER i PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> I � <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORMA,UNLESS A CURRENT FORMA HAS BEEN FILED. <br /> FILE THIS <br /> -FORM <br /> WITFJ�E LOCAL AGENCY IMPLEMENTING THE UNDERGROUND S AGE TANK REGULATIONS <br /> N O FORM B (12-91) ��� �7( p.y ( ` r� i r, I `// I� FOROC646-F6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.