My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Piping system layout <br />(cont'd.) <br />Fig. 6-1. During layout, bonding and <br />inspection, support the piping on <br />2x4 "batter boards" to keep the <br />joints clean and to keep bedding <br />out of the pipe. <br />Fig. 6-2. Use only select materials for <br />bedding and backfilling Dualoy <br />3000/LCX fuel handling systems. Native <br />materials are rarely suitable and should <br />not be used. <br />Fig. 6-3. Support risers by attaching <br />them directly to structure walls. <br />• Grade the trench bottom with at least 6 inches of select backfill to provide firm, <br />even support for the pipe. Compact the subgrade well to prevent differential <br />settling. <br />• Protect the pipe from impact during backfilling and abrasion during operation by <br />surrounding it with four to six inches of select backfill such as washed sand, pea <br />gravel (3/4 -inch maximum) or crushed stone (1/2 -inch maximum). <br />• Wrap pipe lying near concrete with rubber or foam padding to avoid direct contact <br />with the concrete. <br />None► <br />Asphalt <br />2 (min) <br />Concrete <br />4 (min) <br />- 18 (min) <br />8 (min) <br />I <br />4 (min) O O O <br />i Select backfill 6 (min) <br />Native _/ 6 min <br />soil 4 (min) ( ) <br />Supporting valves, accessories and vent lines <br />Do not use fiberglass pipe to support the weight of heavy items in a line such as valves, <br />strainers and steel vent riser pipes. Provide separate supports for valves and <br />accessories. <br />0 <br />Permanent <br />structure <br />O <br />Steel pipe clamp �^ <br />\ I / Steel nipple <br />V/'A�I� <br />Steel <br />Steelriser cooupling <br />Bell x male <br />Steel elbow a- adapter <br />Dualoy3000afiberglass pipe <br />[] <br />
The URL can be used to link to this page
Your browser does not support the video tag.