My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13Simultaneous <br />Procedure: <br />testing (eont'd.) <br />• Join all connections of the primary system. An optional pressure test may be performed <br />once this step is completed to assure integrity of the line while connections are visible. <br />Example: <br />• Complete closure of the containment system. <br />Primary is pressurized to 50 psi; <br />• Connect pressure gauges to each portion (primary and containment) of the system. These <br />containment to 30 psi. The differ- <br />gauges should have full-scale readings no greater than two times the test pressure or to the <br />ential of 20 psi is enough to detect <br />higher pressure of either system, whichever is greater. <br />any communication between the <br />• Pressurize the primary system to its intended test pressure and close off the source to <br />two lines. Should pressure change, <br />check for pressure drops. Allow the system to stabilize should temperature changes be <br />eitherorboth systems mayneed to <br />occurring which can affect the gauge pressure. <br />be inspected and made tight. In this <br />Ameron B.V. P.O. Box 878 P.O. Box 71370 P.O. Box 490 <br />example, pressure increase in the <br />• Pressurize the containment system to a different pressure than that of the primary. Allow <br />secondary indicates a leak in the <br />this system to stabilize also. Note: Temperature sensitivity of the containment will be <br />primary. Pressure decrease in the <br />greater than the primary since it is exposed to the outside environment. Despite intuition to <br />secondary indicates a leak in the <br />the contrary, pressure changes for a given temperature change will not be different for the <br />secondary. A pressure change in <br />low volume containment compared to the higher volume primary. It is, however, potentially <br />both systems in the same direction <br />subject to greater temperature fluctuations. <br />indicates a temperature induced <br />• Maintain slight pressure (5 to 10 psi) on both systems until the construction is completed to <br />pressure change. <br />signal any damage which may be caused by pavement stakes, excavation equipment or <br />other causes. Should the pressure drop in the containment during this time, re -pressurize <br />and check integrity before other steps are taken. Movement of the piping during backfilling <br />may cause the system to burp slightly. The seal of the 0 -ring gasket will be regained when <br />the movement stops. The system can be re -pressurized without concern. <br />14 Health and safety <br />Toxicity of adhesive <br />information <br />Hardener. Irritating to the skin, eyes and respiratory tract: toxic orally; may cause sensitization. <br />.. — — <br />rFOR CHEMICAL EMERGENCY <br />Resin: May be mildly irritating to skin and eyes; may cause sensitization. <br />Handling precautions for adhesive <br />SPILL, LEAK, FIRE, EXPOSURE <br />Hardener. Do not get in eyes, on skin or clothing. Avoid breathing vapor. Wash thoroughly after handling. When <br />OR ACCIDENT I <br />handling in the field, wear gloves and eye protection. When handling in bulk quantities, wear rubber gloves, <br />CALLCHEMTREC-DAY <br />rubber apron and NIOSH approved respirator. <br />I OR NIGHT I <br />Resin: Avoid contact with eyes, skin or clothing. When handling in the field, wear gloves and eye protection. <br />Wash thoroughly after handling. <br />1-800-424-9300 I <br />First aid for adhesive users <br />Toll-free in the continental U.S. <br />In case of contact <br />483-7616 in District of <br />I <br />Eyes: Immediately flush with plenty of water for at least 15 minutes. Call a physician. <br />Columbia <br />Skin: Wash with water and soap if available. <br />For calls originating outside the I <br />Clothing: Remove contaminated clothing and wash before reuse. <br />continental U.S. <br />202-483-7616 -Washington D.C. <br />Inhalation: Remove to fresh air. Give oxygen or artificial respiration rf necessary. <br />collect I <br />Ingestion: If hardener is swallowed and penton is conscious, give plenty of water or milk to drink. Do not induce <br />vomiting. Call a physician. If resin is swallowed, give 100 grams (about Y. Ib) of activated charcoal slurry in water. <br />ALL CALLS ARE RECORDED <br />L ----- <br />Do not induce vomiting. Call a physician. <br />Important notice <br />This literature and the information and recommendations it contains are based on data reasonably believed to be <br />reliable. However, such factors as variations in environment, application or installation, changes in operating <br />procedures, or extrapolation of data may cause different results. Ameron makes no representation or warranty, <br />express or implied, including warranties of merchantability or fitness for purpose, as to the accuracy, adequacy or <br />completeness of the recommendations or information contained herein. Ameron assumes no liability whatsoever <br />A% <br />in connection with this literature or the information or recommendations it contains. <br />A <br />AMERON <br />FIBERGLASS - COMPOSITE PIPE GROUP - HEADQUARTERS <br />P.O. Box 801148 • Houston, TX 77280 • Tel: (713) 690-7777 • Fax: (713) 690-2842 • http://www.ameron.com <br />INTERNATIONAL <br />Asia <br />Europe Americas Composites Centron I nternational <br />Ameron (Pte) Ltd. <br />Ameron B.V. P.O. Box 878 P.O. Box 71370 P.O. Box 490 <br />No. 7A, Tuas Avenue 3 <br />J.F. Kennedylaan 7 Burkbumett, TX 76354 11 McBride Street 600 FM 1195 South <br />Singapore 639407 <br />4191 MZ Geldermalsen Tel: (940) 569-1471 Newnan, Georgia 30263 Mineral Wells, Texas 76068 <br />Tel: 65 8616118 <br />The Netherlands Fax (940) 569-2764 Tel: (770) 253-2000 Tel: (940) 325-1341 <br />Fax 65 862 1302/861 7834 <br />Tel: +31345 587 587 Fax (770) 253-9234 Fax (940) 325-9681 <br />Fax +31345 587 561 <br />01997 Ameron • Printed in U.S A. • FP738E (5/00) supercedes FP738D (9199) • 5M[1241 <br />
The URL can be used to link to this page
Your browser does not support the video tag.