My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Don Mukai _ 2 <br />CONV-B2000 product literature; State Registered Professional Engineer Approval letter; <br />Conversion Frame Specifications; and Bravo Conversion Frame Installation Instructions. <br />State Water Board staff also visited the Bravo production facility where the CONV- <br />B2000 is manufactured. A California registered Professional Engineer has reviewed the <br />Bravo catalog sheet with specifications and the B2000 Conversion Frame Installation <br />Instructions and has concluded that the frame is acceptable for adapting an existing <br />installed UDC to a new dispenser (See Enclosure). <br />Conditions of Approval <br />Based on the Professional Engineer's review and the documentation you've submitted, <br />we are granting approval of the CONV-132000 under the following conditions: <br />1. This model comes in several sizes in order to accommodate various dimensions <br />of UDC and dispenser. Schematics of all existing and future sizes for the CONV- <br />B2000 shall be made available upon request of the State Water Resources <br />Control Board (State Water Board). <br />2. Materials and procedures employed in the construction of the CONV-132000 shall <br />remain the same as the materials that were indicated in the documents reviewed <br />by the State Water Board. <br />3. Installation procedures in no way supersede local, State, and federal regulations. <br />Installers must obey all local laws, regulations, and requirements when installing <br />the CONV-132000. <br />4. The procedures (Bravo Conversion Frame Installation Instructions, dated <br />3/25/08) submitted in the approval process must be followed in their entirety. <br />Any variations in the installation procedures must be reviewed and approved by <br />the State Water Board. <br />5. Only installers meeting the requirements of CCR, Title 23, section 2715(h), <br />including training and certification by the manufacturer (S. Bravo Systems, Inc.), <br />are allowed to install this product. <br />6. Final authority to approve the use of the CONV-132000 in a particular jurisdiction <br />rests with the local regulatory agency. The local agency may require pre - <br />approval, permit, and/or inspection of the installation by either local agency staff <br />or a registered professional engineer (special inspector) who has education and <br />experience with underground storage tank system installations. <br />7. Per CCR, § 2636(f)(1) the UDC must be equipped with a continuous monitoring <br />system that either activates an audible and visual alarm or stops the flow of <br />California Environmental Protection Agency <br />2d Recvcled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.