Laserfiche WebLink
�`.�i i .'a, N�• t;' '^. "iR flit 'T" � o A = a �r�'�yy �`i,'�icl�ri�"�'� k � ��i. C �'"� -•a+ ap - -"'F. <br />A. <br />0:111111AFPR OVED FOR: �ORYR COMPATIBt� EYR SYSTEMS <br />With the Enhanced -Vapor .:Recovery (E -VR) ` . When UST pressure goes positive: 4x <br />Phase II -deadline. anproachmg most.' 4. The TL5-350 opens the valve on the <br />California gasoline dispensing facilities must output port of the canister allowing vapor ' <br />comply with new pressure management to enterthe canister. r <br />regulations before:ipn12D09. As <br />vapor flows through` the canister; <br />Veeder--hoot has developed a 'pressure :-: active carbon'inside:captures die- <br />'hydrocarbon <br />he . <br />management solution that will allow end hydrocarbon vapors allowing clean air <br />insets to comply with these new regulations to e.�t the canister, redueireg pressure = <br />A M1 <br />while minimizing the impact to their facility in the UST €' <br />The Veeder--Root Carbon Pressure `When UST pressure goes negative: <br />Management System reduces evaporative The TLS -350 opens the valve on theN MR <br />n <br />losses caused by over -pressurization and output port of the canister allowing fresh , <br />enter the canister. <br />pro -vides zdes cost -competitive alternative to air to <br />current certified solutions. As the hesh air passes through the <br />cmisfex.the hydrocarbons are <br />This new pressure management system is removed from the carbon and <br />designed to. work withbalance vapor.: Features and Benefits: <br />recovery equipment. The innovative design <br />returned to the USI, reducing <br />inea�ensive installation evaporation.- - Compatible with balance or front-end <br />provides for a quick <br />ORVR detecting Ev systems <br />that eliminates the 'need for:. expensive System requirements: <br />' to install -attaches directly to the <br />concrete pads, protectift. barriers,. or AC Cai-bon Canister vent riser at any station <br />wiring. <br />-> TLS -350 Pius of ITS-35OR with Version 29 Requires a single I./2" tap into the <br />How the system works software` vapor riser pipe <br />The Ueeder-Root : Carbon Pressure Interfaces to the TIS -350 via a single <br />-� <br />Smart SmsorModule —7Chomcl <br />.Management System• mounts directly onto Z=wire 35 connection <br />the station's .erastittg vent riser, utili�ng 'a Wireless option components: -o Requires a single IIS Smart.Sensor <br />single tap into the vapor. space _ of the (UndeC CAR13 Evaluation) Module charmel <br />containment system The canister contains 4: Wirrl6 Transmitterwith Battery Pack Poe s -not require a concrete.pad.or <br />activated.`high capacity' carbon that filters _ <br />emissions that enter through .an inlet at the -a WirdessReceNcr containment homer <br />-o No EIC power required <br />bottom of the canister from the vent pipe: TIS RF careless lnterface.Unit .;, Low. <br />maintenance, no .pumps <br />The outlet -at the top of the carbon canister 7 or-Tpotors <br />releases cleansed air into the atmosphere Continuously monitored for proper <br />reducing the pressure in the underground' ' operation and efficiency <br />_-.- <br />storage tank. The canisters :operation .is- <br />continuously monitored' through an F- m f-� <br />Long -service life <br />electronic control module that is interfaced - <br />�. Low cost installation <br />to the T -LS -350 viae an mtnvsically-safe n K " <br />electrical connection. <br />VCEQQER-ROOT <br />e Rgl^gin . <br />