My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:50:24 PM
Creation date
11/16/2018 10:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />r <br />Page _ of 7 <br />ility is Not Equipped With S ill/Overfill Containment Boxes ❑ <br />UOverfill Containment Boxes are Present, but were Not Tested ❑ <br />F <br />t Method Developed By: ❑ Spill Bucket Manufacturer I J Industry Standard ❑ Professional Engineer'i' <br />❑ Other (.Spec) <br />Test Method LAtd-r-,,,,.. ❑ Pressure ❑ Vacuum O HydrostaO <br />❑ Other (Spec) <br />Test Equipment Used: .,w Equipment Kesofution: <br />Spill Box 4' .:, Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />.� <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): 4""f <br />., <br />Test Duration: <br />Change in lRdading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />-- <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comme is — (ingj!Lde information on repairs madeprior to testing, and recommended ollow-u or ailed tests) <br />! ✓-e✓ <br />11 half L' -j ..e i e2mqk /� ,;car <br />
The URL can be used to link to this page
Your browser does not support the video tag.