Laserfiche WebLink
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />r <br />Page _ of 7 <br />ility is Not Equipped With S ill/Overfill Containment Boxes ❑ <br />UOverfill Containment Boxes are Present, but were Not Tested ❑ <br />F <br />t Method Developed By: ❑ Spill Bucket Manufacturer I J Industry Standard ❑ Professional Engineer'i' <br />❑ Other (.Spec) <br />Test Method LAtd-r-,,,,.. ❑ Pressure ❑ Vacuum O HydrostaO <br />❑ Other (Spec) <br />Test Equipment Used: .,w Equipment Kesofution: <br />Spill Box 4' .:, Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />.� <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): 4""f <br />., <br />Test Duration: <br />Change in lRdading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />-- <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comme is — (ingj!Lde information on repairs madeprior to testing, and recommended ollow-u or ailed tests) <br />! ✓-e✓ <br />11 half L' -j ..e i e2mqk /� ,;car <br />