Laserfiche WebLink
07/2x/2009 14:14 FAX 209 744 0116 <br />S W RCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />10 0006/0006 <br />Page { of -7 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfili Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: 0 Spill Bucket Manufacturer 0 Industry Standard ❑ Professional Engineer <br />C Other (Spec) <br />Test Method Use21 Q Pressure 0 Vacuum C Hydrostat' <br />0 Other (spec) <br />Test Equipment Used: "` Equipment ation: <br />Spill Boz # Spill Box Spill Box # Spilt Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Re=ading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comm" is — (incl information on repairs made prior to testi and recommended oikow- up fbrfailed tests) <br />