Laserfiche WebLink
2 <br />, <br />1 1 1 I I ut <br />nI <br />In <br />In <br />11-3 <br />❑I uI . <br />uI�ff-9 <br />In - <br />I V,7 -- <br />VW -2 <br />APPROXIMATE LIMITS TEW-2 <br />3 <br />OF FORMER LISTS /� EW VW - <br />APPROXIMATE LIMITS -// <br />OF NEW UST SJ <br />J)wo AY <br />S,DEW AIS <br />ISLAND <br />1n-0 <br />VW -4 <br />DRNEWAY <br />7 MW -7 <br />CgAgTEg w AY I <br />N <br />SCALE <br />0 20 40 <br />FEET <br />PROPOSED INTERIM REMEDIATION SITE PLAN 4,4dvaneed <br />SUPER CENTER MART GeoEnviron Vzjmf& , Inc. <br />01 A'orlbern Celifomis <br />701 EAST CHARTER WAY PROJECT NO. AGE -NC -06-1463 FILE: SCM-DPE FIGURE: <br />STOCKTON, CALIFORNIA DATE: 20 JUNE 2000 DRAWN BY: MAC 10 <br />LEGEND <br />MW -1 <br />MONITORING WELL LOCATION & DESIGNATION <br />Be • <br />SOIL PROBE BORING LOCATION & DESIGNATION <br />O <br />CONDUCTOR CASING LOCATION <br />PT1 <br />CPT BORING LOCATION & DESIGNATION <br />VW -1 ]Z( <br />SOIL VAPOR EXTRACTION WELL LOCATION <br />& DESIGNATION <br />/SW <br />-1 ♦ <br />GROUND WATER MM ACTION WELL LOCATION <br />& DESIGNATION <br />R-4 �$( <br />PROPOSED SITE 1fEI1 LOCATION <br />SEVER (DISCHARGE POINT) <br />ItEIfEDIAT[ON ENCLOSURE <br />_ <br />I�®IATION PIPING & D E ItOW-DUtt 01f- <br />- - - <br />UST PIPING i &ONl -U-rr-WCATIOIV----- - <br />1n-0 <br />VW -4 <br />DRNEWAY <br />7 MW -7 <br />CgAgTEg w AY I <br />N <br />SCALE <br />0 20 40 <br />FEET <br />PROPOSED INTERIM REMEDIATION SITE PLAN 4,4dvaneed <br />SUPER CENTER MART GeoEnviron Vzjmf& , Inc. <br />01 A'orlbern Celifomis <br />701 EAST CHARTER WAY PROJECT NO. AGE -NC -06-1463 FILE: SCM-DPE FIGURE: <br />STOCKTON, CALIFORNIA DATE: 20 JUNE 2000 DRAWN BY: MAC 10 <br />