Laserfiche WebLink
Oct 05 06 08:54a Elite Iv Contractors Inc 2094616n42 P,4 <br />FROM :C Dau 1 - PTi- Prevent i ( e c h FRX NO. :847 367 6964 04 2006 09: 21OPM P3 <br />Prevention Technologies, Inc. <br />1120 Abbey C1. Umriydlla. IL 60046 <br />,� � Clfart9 M. Doul <br />/ (>vid LyzW�kl <br />Sumo Fenjetraltion Boot Repair t,Alilh PTI Paste <br />847-367-6Sf orrMkm@aol con) <br />630-784,V,03 d.limrnk soak not <br />81S -497 -.Vii SiVakps j@aoi coir <br />lmportane Nate,- aff surfaces to be repaired MUST be clean and FREE of WATER. <br />1) goat preparation <br />a) f=ollow appropriate safety precautions, including wearing gloves: <br />i) Thoroughty dean surfaces to be repaired as follows: <br />(t) First with acetone - this dries any residual water from the area. <br />(2) Then v*h xyferpe & Scottish Brit O pad until the surface has a dull, matte finish. This <br />includes the boot and any part of the sump or pipe that will be overtapped from the boot. <br />ii) After awffiing, wipe again with a xytwm saturated doth to finish the cleaning. <br />Iii) Allow time for xylene to completely evaporate. <br />b) Make sure all damps aro in place and are i>lyht. <br />2) PTi Pante preparation <br />a) Scrape all of the Part 8 catalyst from its conger into the Part A container <br />b) After emptying fie Part B container, put a unaill amount of Part A info the Part B container end <br />stir unfit the inside of the container is completely coated and gray in color (this wdl render <br />container environmentally safe for disposal)_ <br />c) Mix Part A and Part 8 using a spiral point mover and a heavy-duty electric drill or equivalent until <br />paste is thoroughly Mended. THE PRODUCT IS THOROUGHLY MIXED WHEN IT IS UNIFORM <br />IN COLOR WITH NO BLACK, GRAY OR WHITE STREAKS VISIBLE, <br />3) PTi P$ste ggpfi <br />a) Wearino WDEX rubber gloves or equivalent and sleeve protectors, apply paste by hand to boot <br />area and completely encapsulate boot to the thickness of no Iess than %inch_ Make sure to <br />spread paste beyond the boot ends onto the pipe and the sump walls th rt wart cleaned as part <br />of the preparation. <br />b) Tools can be deemed with xylene. Hand& and akin can be cleaned with Fast Orange or any <br />equivalent hand cleaner. <br />c) Product seta up in about 1- 2 haus with at total cure in about 24 hours at 7(l° F. <br />Note: At cooler temperatures down to 50° F the cure wilt take longer, Do not apply to surfaces <br />below 50'F unless an outside heat source will be used to aid curing. <br />4) Dispoaa) <br />a) Allow the unused portion of the thoroughly mixed PTi Paste to harden for safe disposal. The <br />hardened material is a non -t azardous solid. <br />Versinn 1/26-12.14.01 <br />