My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
2300 - Underground Storage Tank Program
>
PR0231059
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2023 4:26:58 PM
Creation date
11/16/2018 11:31:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231059
PE
2361
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
01
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE. TESTING <br />Page of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />0 Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />0 Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run #1 <br />Fiberglass <br />Piping Run #2 <br />Fiberglass <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />Ameron <br />Ameron <br />y R <br />Piping Diameter: <br />2 %" OD <br />2 ''/z" OD <br />: k <br />Length of Piping Run: <br />Approx. 100' <br />Approx. 110' <br />Product Stored: <br />Regular 87 <br />Super 91 <br />- - <br />Method and location of <br />piping -run isolation: <br />Clam Shell Test port <br />at Piping Sump #1 <br />Clam Shell Test port <br />at Piping Sump #2 <br />E <br />MYIF ONMENTAL <br />Wait time between applying <br />pressure and startingtest: <br />5 Minutes <br />5 Minutes <br />M=, <br />.I- T' <br />Test Start Time: <br />11:35 <br />11:45 <br />Initial Reading (RI): <br />5 Psi <br />5 Psi <br />Test End Time: <br />12:35 <br />12:45 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable loss <br />No detectable loss <br />Test Result: <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.