Laserfiche WebLink
JNIFIED PROGRAM CONSOLIDATED FORD. <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> L UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490 sae <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING El 2. 3.ELECTRONIC STAND-ALONE <br /> 2.FLOAT AND CHAIN ASSEMBLY 490-54b <br /> ❑4.NO DISPENSERS _ 099.OTHER(Specify): <br /> PANEL MANUFACTURER: Veeder Root a9oss MODEL#:_TLS 35U 490.56. <br /> r LEAK SENSOR MANUFACTURER:Yeeder Root <br /> 490-171 MODEL#(S)0794380-26-8- 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS )Ma.YES El b.NO 490-59 <br /> � a YE <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN )m a.YES ❑b.NO 490.60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ] a YES ❑b.NO 490-62 <br /> 1 2.UDC CONSTRUCTION IS ®1.SINGLE-WALLED [12.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 490.64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: [11.LI UID ❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 490.64b <br /> VII.PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br /> LEAK DETF,CTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> ]a2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS 490-66 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49"7 <br /> _ VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> XJ Alarm logs 490-68a K]Visual Inspection Records 490-68b Tank integrity testing results 490-68c <br /> X]SIR testing results(and supporting documentation records). 490.684 Tank gauging results(and supporting documentation records). 490-68e <br /> ATG Testing results(and supporting documentation records).490-681 ❑ Corrosion Protection 60-day logs 490-69a <br /> $]Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING - -- <br /> $]Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-698 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> X1 THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> X1 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> $] CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> g] CALIFORNIA UNDERGROUND STORAGE TANK LAW 49"9. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYS'rEmsS 490-69, <br /> ❑ OTHER(Specify):M69h,M69i <br /> ❑This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> D Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> !Tank over fill prevention unleaded tank #1, audible and visual.^alarm @90% <br /> Tank#2 unleaded audible and visual alarm @87%, Diesel tankr..Y� ' ' - ' <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment mmtenanc <br /> NAME Rand Lane 490-72 TITLEFfeet Services Supervisor 490-73 <br /> NAME 49o-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTII• ATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> ADPL A SIGNATURE 490-76 DATE: 490-77 <br /> 6/30/2011 <br /> 811 L.laOk-'_11/) �' Itl _(1�• r ELI—A uthouz ,mr <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490--79 <br /> Randy Laney Fleet Services Supervisor <br /> UPCF USI'-D(12/2007)3/4 <br />