My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 1986 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 11:20:16 AM
Creation date
12/4/2018 11:09:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2001
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OIPW 61 TNG OVERFILL PREVENTION VALVES <br /> Operating Principle •Integrated Adaptor-The <br /> 61TNG-4000 has its own built-in <br /> The 61TNG operates using a venturi adaptor reducing space requirements <br /> mechanism similar to an automatic in the spill container and overall <br /> gasoline nozzle.Product flow thxough costs white simplifying installation. ' <br /> a suction tube generates a vacuum that The 61TNG-4100 has a threaded top <br /> I,;initially supplied through a sensor to accommodate a separate tight fill <br /> tube that extends into the tank.The <br /> sensor tube is cut at the desired shut adaptor.(The height of the separate <br /> adaptor may preclude the use of the <br /> off level.Once the product level reach- 61TNG-4100 in some shallow bucket <br /> es the tip of the sensor tube,the spill containers. Sec clearance <br /> vacuum is redirected behind a requirements on next page.) <br /> diap�trarm.Diaphragm movement,in <br /> turn,operates a cam that moves the •Complete Unit-The TING is a com- <br /> poppet into the flow stream.The prod- plete package that is pre-assembled. <br /> uct flow then closes the valve.The It comes out of the box ready to <br /> valve remains closed until the head install. (61TNG-4(.10114101 are sup- <br /> pressure is relieved.The shut-off plied with lower tubes for new instal- <br /> process is repeated each time delivery lations.) <br /> into a full tank is attempted. ♦Automatic Operation -The TNG <br /> operates automatically without the <br /> Features include: need for driver intervention. <br /> ♦ Easy Installation-Requires attach- Compared with ball floats,flow is <br /> ing and cutting the Iowa drop tube unrestricted and continues unimped- OPW 61TNG-4000 <br /> and one cut of the sensor tube at the ed until the shut-off point is reached. <br /> desired shut-off level.The 61TNG ♦Allows For Maximum Filling Of <br /> threads directly into a thread-on Tank-The shut-off point can be set <br /> spill container. at any level up to 99%of tank capac- <br /> ity.Minimal Flow Restriction - ity.The precision repeatability pro- <br /> Straight through flow path ensures a vides for maximum tank fill while <br /> neglible effect on flow rates and maintaining a dry tank top as pre- <br /> drop times. scribed by EPA regulations. <br /> ♦ Minimal Maintenance-Due to the Important <br /> mechanism's location(in the spilt <br /> container) and the minimal number In order to prevent product spillage <br /> of ing parts,maintenance,if from the Underground Storage Tank <br /> required, is simple.A flanged joint (UST),properly maintained delivery <br /> equipment <br /> allows the entire unit to be easily <br /> equipment and a proper connection at <br /> removed far tank testing without the tight fill adaptor are essential. <br /> ever breaking the threaded joint in Delivery personnel should be managed <br /> the spill container. and trained to inspect delivery elbows <br /> and hoses for damaged and missing <br /> ♦Quick Drain Time-After shut-off, parts.They should always make certain <br /> the valve is held closed by the head there is a positive connection between <br /> pressure of the product.Once the the adaptor and elbow.If delivery <br /> Truck valve is closed and the head equipment is not properly maintained, <br /> pressure is relieved,the valve opens ar the elbow is not securely coupled to <br /> automatically. Hose walk-down can the adaptor-a serious spill may result <br /> begin immediately. when the OPW 61TNG closes-causing <br /> ♦Immediate Tank Sticking-The a hazard,and environmental contamina- <br /> fast drain feature allows a driver to tion. <br /> stick the tank immediately after the ,Vote:The OPW 61 TNG Overfill <br /> hose is emptied. Prevention Valve is not to be used in <br /> pumping applications.The 61TNG is <br /> designed only for tight fill.gravity drop <br /> applications. <br /> Q P VV, 1#60vw 1513)670.1719•(x00)422-7575►Fox: 170 9116•(600)421.3297 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.