Laserfiche WebLink
O' PW 61 TNG OVERFILL PREVENTION VALVES <br /> Operating Principle • Integrated Adaptor-The <br /> 61TNG-4000 has its own built-in <br /> The 61 TNG operates using a venturi adaptor reducing space requirements <br /> mechanism similar to an automatic in the spill container and over-all 'cF <br /> gasoline nozzle.Product flow through costs while simplifying installation. NG'. <br /> a suction tube generates a vacuum that The 61TNG�100 has a threaded top <br /> I,.; initially supplied through a sensor to accommodate a separate tight fill <br /> tube that extends into the tank.The adaptor. (Tire height of the separate <br /> sensor tube is cu[at the desired shut- adaptor may preclude the use of the <br /> off level.Once the product level reach- 61TNG-4100 in some shallow bucket <br /> es the tip of the sensor tube,the <br /> vacuum is redirected behind a spill con[ainers. See clearance <br /> i �1diaphragm.Diaphragm movement,in requirements on next page.) <br /> turn,operates a cam that moves the •Complete Unit -The TNG is a com- 1 <br /> poppet into [he flow stream.The prod- plete package that is prc-assembled. <br /> uct flow then closes the valve.The It comes out of the box ready to <br /> valve remains closed until the head install. (61TNG-1001/4101 are sup- <br /> pressure is relieved. The shut-off plied with lower tubes for new instal- <br /> process is repeated each time delivery lations.) <br /> into a full tank is attempted. ♦Automatic Operation-The TNG <br /> operates automatically without the <br /> Features include: need for driver intervention. <br /> ♦ Easy Installation-Requires attach- Compared with ball floats,flow is <br /> ing and cutting the lower drop tube unrestricted and continues urtimped- OPW 61TNG-4000 <br /> and one cut of the sensor tube at the ed until the shut-off point is reached. <br /> desired shut-off level.The 61TNG ♦Allows For(Maximum Filling Of <br /> threads directly into a thread-on Tank -The shut-off point can be set <br /> spill container, at any level up to 99%of tank capac- <br /> * Minimal Flow Restriction - icy.The precision repeatability pro- <br /> Straight through flow path ensures a vides for maximum tank:fill while <br /> neglible effect on flow rates and maintaining a dry tank top as pre- <br /> scribed by EPA regulations. <br /> drop times. <br /> ♦ Minimal Maintenance- Due to the Important <br /> mechanism's location (in the spill <br /> container) and the minimal number In order to prevent product spillage <br /> of moving parts,maintenance,if from the Underground Slot- , Tznk <br /> required, is simple.A flanged joint (UST),properly maintained delivery <br /> allows the entire unit to be easily equipment and a proper connection at <br /> removed for tank testing without the tight fill adaptor are essential. <br /> ever breaking the threaded joint in Delivery personnel should be managed <br /> the spill container. and trained to inspect delivery elbows <br /> and hoses for damaged and missing <br /> ♦ Quick Drain Time-After shut-off, partsThey should always make certain <br /> the valve is held closed by the head there is a positive connection between <br /> pressure of the product.Once the the adaptor and elbow.If delivery <br /> truck valve is closed and the head equipment is not properly maintained, <br /> pressure is relieved,the valve opens or the elbow is not securely coupled to <br /> automatically. Hose walk-down can the adaptor-a serious spill may result <br /> begin immediately. when the OPW 61TNG closes-causing <br /> Immediate Tank Sticking •The a hazard,and environmental contamina- <br /> fast drain feature alloWs a driver to tion. <br /> stick the tank immediately after the <br /> Note:The OPIV 61TNG Overfill <br /> hose is emptied. Prevention Valve is not to be used in <br /> pumping applications.The 61TNG is <br /> designed only for tight fill.gravity drop <br /> applications. <br /> P t [5131610 3II9• d0())1u•2525.kL t513 d1a9t • <br />