Laserfiche WebLink
Cost: Provide and install the boards, extend the wires, and complete final <br /> tests and report............................................................$1175.00 <br /> 2. Install permanent reference electrodes at each tank system. Attached is a drawing <br /> Figure 2 which indicates how each electrode should be placed. This will <br /> minimize voltage error measurements in the potentials gathered during <br /> inspections. <br /> Cost: Provide and install five reference cells (20 year guarantee), at grade <br /> type brooks 1-RT traffic rated boxes......................................$3,650 <br /> Although recommendation 2 is not required it is highly recommended based on past <br /> experience with these types of storage tank systems. <br /> We appreciate this opportunity to be of service to you on this project and look forward to <br /> working with City of Lodi on future projects. I will be in contact with you regarding the <br /> aforementioned recommendations. Should you have further questions or desire additional <br /> information please contact us at (925) 736-0783. <br /> Sincerely, <br /> Blacl Group Ltd. <br /> onald L. Bianchetti, P.E. <br /> President <br /> Blackstone 3 <br /> Group <br /> Ltd. <br />