My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 1986 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 11:20:16 AM
Creation date
12/4/2018 11:09:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2001
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATING POSITIONS <br /> f <br /> full Pum <br /> Full Dump P Full PumpPressure <br /> r Pressure Pressure <br /> 1 1 <br /> 0-4 jpsi 5-18 psi \ Full Pump <br /> \ \ Pressure <br /> POSITION I Position 1 is the POSITION 2-When pressure in the POSITION 3 -If the pressure <br /> "tripped" or"reset"position.The LD- delivery system has reached 12-15 psi, continues to rise, the <br /> 2000 goes into this position when the the piston and poppet assembly moves LD-2000 will move to <br /> pressure in the delivery system drops to to Position 2-the"leak sensing" posi- Position 3-the"full flow" <br /> 4 psi or less at the leak detector. tion. position. In position 3, the <br /> LD-2000 will allow full <br /> In the reset position, the LD-2000 is As the poppet moves to this position, flow of product from the <br /> ready to look for a leak in the delivery the cross hole in the poppet centers submersible pump to enter <br /> system the next time the submersible around the head in the metering pin. the delivery system. <br /> pump is tumed on. With the pump Since the head of the pin is consider- <br /> turned on, the LD-2000 will allow ably larger than the shaft,flow is <br /> approximately 1.5 gallons of product restricted from 1.5 GPM to 3 GPH or <br /> per minute to enter the delivery system less. <br /> through a cross hole in the poppet. <br /> If there is a leak in the delivery <br /> In Position 1, a portion of the cross system of 3 GPH or more,the pressure <br /> hole is positioned around the narrow in the delivery system will not rise, and <br /> part of the metering pin. Pressure will the LD-2000 will stay in this position. If <br /> build very quickly to 12-15 psi. As the there is no leak in the delivery system, <br /> pressure builds in the delivery system, the pressure will continue to rise. <br /> it also increases under the piston in the <br /> top of the LD-2000. This pressure <br /> causes the piston and poppet to move <br /> upward. <br /> For further information about the LD-2000 or other leak detection equipment, <br /> contact your local distributor or call: <br /> VAPORLESS MANUFACTURING, INC. <br /> 9234-C East Valley Road - Prescott Valley, AZ 86314 <br /> 1-800-367-0185 - (602) 775-5191 - (6 02) 775-5309-FAX <br /> tMade in the United States of America <br /> W Printed on Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.