My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:07:54 PM
Creation date
12/4/2018 11:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2005
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site address: }` Date of Testirtg/Senzcin**: - <br /> F. In-Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used onl} for inventon•control. <br /> Check this boa if no tank gauging or SIR equipment is installed- <br /> This <br /> nstalledThis section must be completed if in-tank- gauging equipment is used to perform leak detection motutorin . <br /> Co fete the following checklist: <br /> E es ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? j <br /> es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? !. <br /> "es ' ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> 16 Yes ❑ No* Were all items on the equipment manufacturers mainienance checklist completed'? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Coqrolete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment cation, was a leak simulated to verify LLD performance'? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 3 g.p.h.`: ❑ 0.1 g p.h_'; ❑ 0.2 g.p.h., <br /> Notes: 1. Required for equipment start-up certification and anmlal certification. <br /> 2. Unless mandated by local agency,certification required onh•for electronic LLD start-up. <br /> Yes ❑ No* , Were all LLDs confirmed operational and accurate within regulatory requirements`' <br /> L es ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs_ does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ o* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 9 N/A <br /> ❑ Yes ❑ o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> IN/A or disconnected? <br /> ❑ Yes ❑/No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> XN/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs_ have all accessible wiring connections been visually_ inspected? <br /> YN/A <br /> Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist compieted? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Ti. Comments: <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.