My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:07:54 PM
Creation date
12/4/2018 11:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2005
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: �. .,: Date of Testittg/Servicing: <br /> F. In-Tank Gauging ! SIR Equipment: ❑ Check this box if tank gaging is used only for inventory controL <br /> Cheek this box if no tank gauging or SIR equipment is installed <br /> This section must be compieted if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Co Tete the following checklist: <br /> ! if/yes ❑ No* Has all input wiring been inspected for proper entre-and termination. including testing for _round faults? <br /> "es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup" I <br /> ©/yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes j ❑ No* Was accuracy of system water level readings tested`' <br /> Yes ❑ No* Were all probes reinstalled properly`? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co tete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment _ fication_ was a leak simulated to verify_ LLD performance? <br /> ❑ N/A !Check all that apply) Simulated leak rate: 0"33 g.p.h.': ❑ 0.1 -.p.h_'; ❑ 0.2 g.p.h.' <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency.certification required only for electronic LLD start-up. <br /> es ❑ No* i Were all LLDs confirmed operational and accurate within regulatory requiremems--.1 <br /> i✓ es ❑ No* Was the testing apparatus properly calibrated" <br /> Yes ❑ No* For mechanical LLDs_ does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ! -, o* For electronic LLDs,does the turbine automaticalh_�shut off if the LLD detects a leak? <br /> NIA <br /> ❑ Yes { ❑ o* For electronic LLDs, does the turbine amomaticalty shut off if any portion of the monitoring system is disabled <br /> LL; N/A or disconnected? <br /> ❑ Yes ❑/No* For electronic LLDs, does the turbine automaticaUv shut of if any portion of the monitoring system <br /> ©(N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs_ have all accessible wiring connections been visually_ inspected? <br /> YN/A <br /> Yes ❑ No* Were alt items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 --- --- ---- -- - usiat -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.