Laserfiche WebLink
Site Address: �. .,: Date of Testittg/Servicing: <br /> F. In-Tank Gauging ! SIR Equipment: ❑ Check this box if tank gaging is used only for inventory controL <br /> Cheek this box if no tank gauging or SIR equipment is installed <br /> This section must be compieted if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Co Tete the following checklist: <br /> ! if/yes ❑ No* Has all input wiring been inspected for proper entre-and termination. including testing for _round faults? <br /> "es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup" I <br /> ©/yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes j ❑ No* Was accuracy of system water level readings tested`' <br /> Yes ❑ No* Were all probes reinstalled properly`? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co tete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment _ fication_ was a leak simulated to verify_ LLD performance? <br /> ❑ N/A !Check all that apply) Simulated leak rate: 0"33 g.p.h.': ❑ 0.1 -.p.h_'; ❑ 0.2 g.p.h.' <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency.certification required only for electronic LLD start-up. <br /> es ❑ No* i Were all LLDs confirmed operational and accurate within regulatory requiremems--.1 <br /> i✓ es ❑ No* Was the testing apparatus properly calibrated" <br /> Yes ❑ No* For mechanical LLDs_ does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ! -, o* For electronic LLDs,does the turbine automaticalh_�shut off if the LLD detects a leak? <br /> NIA <br /> ❑ Yes { ❑ o* For electronic LLDs, does the turbine amomaticalty shut off if any portion of the monitoring system is disabled <br /> LL; N/A or disconnected? <br /> ❑ Yes ❑/No* For electronic LLDs, does the turbine automaticaUv shut of if any portion of the monitoring system <br /> ©(N/A malfunctions or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs_ have all accessible wiring connections been visually_ inspected? <br /> YN/A <br /> Yes ❑ No* Were alt items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 --- --- ---- -- - usiat -- <br />