Laserfiche WebLink
SVV`RCB, January 2002 <br /> Page of <br /> S. SPULLIOVERFELL CONTAP4MENT BOXES <br /> Facility is Not Equipped With Spill/Ove.-fill Containment Boxes <br /> Spill/Over-fill Containment Boxes are Present but were Not Tested <br /> Test Nlethod Developed By: <br /> --j Spill Bucket Manufacturer ❑Industry Standard Professional Engineer <br /> E Other(Specify) <br /> Test Method Used: 0 Pressure 17 Vacuum I Hvdrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: I Equipment Resolution: <br /> Spill Box# Spill Box# spin Box# j SPM Box 9 <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rq): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R4): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Basalt: 0"kaw 0'Fait 0- Pin, 0 F"' ,CIPail <br /> 1 <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />