Laserfiche WebLink
SWRCB,January 2002 Page Of <br /> I SECONDARY PIPE TESTING <br /> Test Method Developed Bv: Piping Manufacturer �,- n stry Standard Professional Engineer <br /> El Otter <br /> (Specify) <br /> Test Method Used: P-Kressure I Vacuum 0 Hydrostatic <br /> ED Other(Specify) <br /> Test Equipment Used: j Equipment Resolution: <br /> v <br /> 21 Piping Run# <br /> Piping Run# Piping Run# n# <br /> Piping Material: <br /> Piping Manufacturer: L'I <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored.- C L�41e el- VZZ l;; <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> premurelvacuum/water and <br /> starting test: <br /> Test Start Time: <br /> 6 <br /> Initial Reading W: <br /> Test End Time <br /> Fkal Reading(14): <br /> Test Duration: <br /> Change in Reading(RF44): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Tiest...'R Passoa A <br /> � D�ft W �.D Fiff 0 Pass Di�it� 0 Pglss.�. O.Faa, <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1),-7e--) 7 <br /> lf/may/zz� ell <br />