Laserfiche WebLink
D. Results of Testinb/Servich. <br /> Software Version Installed: <br /> Complete the following chectdist: <br /> es ❑ No* L the audible alarm operational? <br /> Yes ❑ Nn* LS the visual alarm operational' <br /> es D No" f Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Yes ❑ No- Were all sensors installed at lowest DOittt of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> L Yes ❑ No* if alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ❑ ?QUA operational? <br /> Er Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak.,fails to operate;or is electrically disconyected 7 If yes: which sensors itutiate � <br /> fpositive shut-down? (Check all that apply) Q"Sump/Trench Sensors; ErDispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/discoanection? ❑Yes; ❑No. <br /> 3'Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank- overfill warning device (i.e. no <br /> 13N,A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank- I <br /> fill points)and operatingproperly? If so, at what percent of tank-capacity does the alarm trigger? 'T�T— % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensms,probes,or other equipment replac�'J <br /> and list the manufacturer name and model for all renlacement parts in Section E,below. <br /> Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all tha:apply) <br /> Product; ❑Water, If yes,describe causes in Section E.below. <br /> uf Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if a pplicable <br /> 0 Yes ❑ No* I Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below.describe how and when these deficiencies were or will he corrected. <br /> E. Comments: 1 J ATL-L r h \i�s vt l qmf ` 2- l V R�'O�"O J N <br /> 0 P�gC cD I Lyr,f . <br /> page 2 or 3 03/01 <br />