My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:07:54 PM
Creation date
12/4/2018 11:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2005
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN CUUNTY ENVIRONMENTAL HEALTH DEW&TMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN PAGE 1 <br /> •MOI. <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> M02. <br /> PLAN TYPE ❑ MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> 1'INFORMATION <br /> e. <br /> FACILITY ID#(Agency Use Only) `" , 4A�- k <br /> M03. <br /> FACILITY NAME City of Lodi <br /> Moa. CITYLo mos. <br /> FACILITY SITE ADDRESS 1331 S Ham Lane <br /> r ?�. <br /> rIT EQT1WMENT=TESTING ANI) PREVENTIVE`MA►TNTENANCE K <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc)be performed in Mob. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. Mol. <br /> MONITORING EQUIPMENT IS SERVICED 1 ANNUALLY ❑ 99 OTHER(Specify) <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hazardous Materials Business Plan map,etc which shows all required tnformatton,include it with thls� an. <br /> ;;7 , t <br /> TANK <br /> -MONITORING <br /> t..,....... ..... - y._r fin . .. .. ..<.. .... ...<, y. ... M10. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) MI I <br /> rr <br /> PANEL MANUFACTURER: <br /> SECONDARY CONTAINMENT IS: 1� a.DRY [Ib.LIQUID FILLED El c.UNDER PRESSURE ❑ d.UNDER VACUUM MI3 <br /> ^^a'root M12. MODEL#: TLS350 Mla. MODEL#(S): LD2000 MI5. <br /> LEAK SENSOR MANUFACTURER:Veed rn�t <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) iM16. VioDEL#: TLS350 M17. <br /> PANEL MANUFACTURER: Veedroot - M19. <br /> IN-TANK PROBE MANUFACTURER: Veederoot - <br /> M18- MODEL#(S): 57601370 <br /> LEAK TEST FREQUENCY: K] a.CONTINUOUS [Ib.DAILY/NIGHTLY El c.WEEKLY M21. <br /> [Id.MONTHLY <br /> 11e.OTHER(Specify): Mzl. <br /> Mzz. M23. <br /> PROGRAMMED TESTS: Ela.0.1 g.p.h. ❑ b.0.2 g.p.h. El c.OTHER(Specify): Mz4 <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 M25 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 M26 M27 <br /> TEST FREQUENCY: 11a.ANNUALLY [_1b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ® 6.VISUAL MONITORING DONE: 12 a.DAILY ❑ b.WEEKLY(Requires agency approval) M2s <br /> ❑ 99 OTHER(Specify) <br /> Y PIPE MONITORING <br /> e <br /> rNITORINGIS PERFORMED USING THE FOLLOWING METHODS)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT Mai <br /> SECONDARY CONTAINMENT IS: ® a.DRY El b.LIQUID FILLED ❑ c.UNDER PRESSURE [Id.UNDER VACUUM M33. <br /> PANEL MANUFACTURER: Veederoot M32- MODEL#: TLS350 <br /> LEAK SENSOR MANUFACTURER: M34. MODEL#(S): M35.M36 <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? Ela.YES [Ib.NO <br /> WILL FAILURFJDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> M37. <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 1131M39. <br /> MLLD MANUFACTURER(s): MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> Mao. MODEL#: Mal. <br /> ELLD MANUFACTURER: M42. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> � <br /> ❑ b.NO M43. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN. ❑ a.YES Ms4 <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? [I a.YES C] b.NO <br /> ❑ 4.INTEGRITY TESTING M45. M46. <br /> TEST FREQUENCY: Ela.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ® 5.VISUAL MONITORING DONE: ® a.DAILY ❑ b.WEEKLY' ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- Mal. <br /> 'Requires agency approval "Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) tills <br /> ❑ 99.OTHER(Specify) <br /> 07/23rU3 <br /> SJCEHD-d(07/03)-1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.