My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
1331
>
2300 - Underground Storage Tank Program
>
PR0231332
>
COMPLIANCE INFO 2002 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 2:07:54 PM
Creation date
12/4/2018 11:32:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2005
RECORD_ID
PR0231332
PE
2361
FACILITY_ID
FA0003961
FACILITY_NAME
LODI MUNI SERVICE CENTER
STREET_NUMBER
1331
Direction
S
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03104050
CURRENT_STATUS
01
SITE_LOCATION
1331 S HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN OUNTY ENVIRONMENTAL HEALTH DE ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN — PAGE 1 (One form per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION Rol. <br /> I FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> Y <br /> FACILITY NAME Roz. <br /> CITY OF LODI <br /> FACILITY SITE ADDRESS R03. CITY Roo. <br /> 1331 S. HAM LANE LODI, CA <br /> , TT. HOD� <br /> SONTOANDII ANIPM <br /> f <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored�in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> .x,w ...s' III SPILL COk�IT'ROL AND CLEAN UP L ITIPMEN�' _ x <br /> PERIODIC MAINTENANCE: Spill control and clean-upequipment ke t permanently o Q <br /> p p _ y .n-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete only if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> VACCON RIO. 1331 S. HAM LANE Rzo. ANY TIME R30. <br /> FLOOR SWEEP RI 1. 1331 S. HAME LANE mi ANY TIME R31. <br /> OT CONTAINERS R12. VENDOR — ELITE IV R22. UPON CALLING VENDOR R32. <br /> R13. R23. R33. <br /> R14. R24. Ria. <br /> R15. R25. R35. <br /> ]W ;RESPONSIBLE PERSONS <br /> C <br /> v <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAIN: <br /> Rso. <br /> NAME ROGER RICH Rao. TITLE FLEET SUPERVISOR <br /> Rsl. <br /> NAME RANDY LANEY R4 I. TITLE LEAD EQUIPMENT MECHANIC <br /> Raz. TITLE R52. <br /> NAME PAUL BOTELLO LEAD EQUIPMENT MECHANIC <br /> NAME <br /> R43. TITLE R53. <br /> DENNIS CALLAHAN IL EET & FACILITIES MANAGER <br /> `F V.INDIRECT,HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R60. <br /> IDENTIFY SOURCE OF PROBLEM, ISOLATE PROBLEM AND CALL SUPERINTENDENT WHO WILL IMMEDIATELY <br /> ONTACT ELITE IV, WHO WILL REMOVE ANY UNAUTHORIZED RELEASES WITHIN THE SECONDARY <br /> CONTAINMENT AND HAVE AN APPROVED D.O.T. HAULER HAUL IT AWAY. IF CLEAN UP RESUMPTIONS OF <br /> NORMANL OPERATION WITHIN 8 HRS OCCURS S.J.H.D. WILL NOT BE CONTACTED. <br /> SJCEHD-e(06/03)-1/3 06/25/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.